Laserfiche WebLink
CABARRUS COUNTY' <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> FISHERTOWN AREA <br /> <br /> (IRISH BUFFALO CREEK BASIN) <br /> <br /> NOVEMBER 21, 198& <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br />12" SEWER 0 LF 52.00 <br />8" SEWER 2&,500 LF 27.00 715~500 <br />4' DIA MANHOLES 88 EA 1,500.00 114,400 <br />24" SCP (BORED) 0 LF BO.O0 0 <br />l&" SCP (BORED) 1200 LF &O.O0 72,000 <br />PUMP STATION (TYPE A) ~ EA 25,000.00 75,000 <br />~" FORCE MAIN 2000 LF 10.00 20,000 <br /> <br /> SUBTOTAL <br /> CONTINGENCIES 149,100 <br /> <br /> CONSTRUCTION COST $1,14~,000 <br /> <br /> ENGINEERING, LEGAL & <br /> ADMINISTRATIVE 172,000 <br /> LAND 15~000 <br /> <br /> PROJECT COST $1,555,000 <br /> <br />HDR INFrAStRUCTURE INC. _ . FILENAME:CSS6A 21-Nov-B6 <br /> <br /> <br />