Laserfiche WebLink
OABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> KANNAPOLIS COLLECTOR LINES <br /> <br /> RAINBOW DRIVE AREA <br /> <br /> (IRISH BUFFALO CREEK BASIN) <br /> '. NOVEMBER 21, 19B6 <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br /> 12" SEWER 0 LF 52.00 $0 <br /> S" SEWER 11~500 LF 27.00 510~00 <br /> 4' DIA MANHOLES 58 EA 1~00.00 4~,400 <br /> 24" SOP (BORED) 0 LF 80.00 0 <br /> 1~" SOP (BORED) 1200 LF ~0.00 72,000 <br /> PUMP STATION (TYPE A) I EA 25,000.00 25,000 <br /> &" FORCE MAIN 1500 LF 10.00 15,000 <br /> SEEDIN~ 0 AC 1,~00.00 0 <br /> <br /> SUBTOTAL $471~00 <br /> OONTINSENCIES 70,100 <br /> <br /> CONSTRUCTION COST $5~2,000 <br /> <br /> ENGINEERINS, LEGAL & <br /> ADMINISTRATIVE 81,000 <br /> LAND 5,000 <br /> <br />.. PROJECT COST $&28,000 <br /> <br /> HDR INF~AS~RUCTUR~ iNC. _ .__ FILENAME,CSS&B 21-Nov-B& <br /> <br /> <br />