Laserfiche WebLink
CABARRUS C0UNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> KANNAPOLIS COLLECTOR LINES <br /> <br /> FISHER STREET AREA <br /> <br /> (IRISH BUFFALO CREEK BASIN) <br /> <br /> NOVEMBER 21, 1~B6 <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br /> 12" SEWER 500 LF 32.00 $1&,000 <br /> 8" SEWER 2~000 LF 27.00 785,000 <br /> 4' DIA MANHOLES 98 EA 1,500.00 127,400 <br /> 24" SCP (BORED) 0 LF 80.00 0 <br /> l&" SCP {BORED) 1800 LF ~0.00 108,000 <br /> PUMP STATION (TYPE A) 5 EA 25,000.00 75,000 <br /> PUMP STATION (TYPE B) I EA 50,000.00 50,000 <br /> &" FORCE MAIN 5200 LF 10.00 52,000 <br /> SEEDING I AC 1,600.00 1,600 <br /> <br /> SUBTOTAL $1~215~000 <br /> CONTINGENCIES 182,000 <br /> <br /> CONSTRUCTION COST $1,595,000 <br /> <br /> ENGINEERING, LEGAL & <br /> ADMINISTRATIVE 209,000 <br /> LAND 2&,O00 <br /> <br /> PRO3ECT COST $1,502,000 <br /> <br />.HDR .I~FRA~T~U~TUR~ ]NC~_. FILENAME:CSS6C 21-Nov-B& <br /> <br /> <br />