Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> PROPOSED SEWER FACILITIES <br /> <br /> CONSTRUCTION COST ESTIMATE <br /> <br /> FOR <br /> <br /> POPLAR TENT/ROCK HILL CHURCH RD AREA <br /> <br /> (IRISH BUFFALO CREEK BASIN) <br /> <br /> NOVEMBER 21, 198& <br /> <br /> ITEM QUANTITY UNITS UNIT TOTAL <br /> PRICE COST <br /> <br />12" SEWER 5,000 LF 52.00 $1&0,000 <br />8" SEWER &2~200 LF 27.00 1,&79,400 <br />4' DIA MANHOLES 224 EA 1,500.00 291,200 <br />24" SCP (BORED) 100 LF 80.00 <br />1~" SCP (BORED) 2000 LF &O.O0 120,000 <br />PUMP STATION (TYPE A) I EA 25~000.00 25~000 <br />PUMP STATION (TYPE B) 2 EA 50~000.00 100,000 <br />PUMP STATION (TYPE C) I EA 75~000.00 75~000 <br />&" FORCE MAIN 5800 LF 10.00 5B,O00 <br />SEEDING 7 AC l~&O0.O0 11,200 <br /> <br /> SUBTOTAL $2~527~800 <br /> CONTINGENCIES 57~200 <br /> <br /> CONSTRUCTION COST t2,907~000 <br /> <br /> ENSINEERING~ LEGAL & <br /> ADMINISTRATIVE 45&,000 <br /> LAND 50~000 <br /> <br /> PRO~ECT COST <br /> <br />HDR INFRASTRUCTURE INC. F,ILENAME~CSS6D. 21-Nov-S& <br /> <br /> <br />