Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> BUILDING PEP~IT FEE SCHEDDLE <br /> <br /> FOR NEN CONSTRUCTION <br /> EFFECTIVE <br /> <br />ESTINATED COST FEE ESTL'~ATED COST FEE' <br /> <br />*1,000 .............. 10.25 26,000 ............... 54.00 <br />2,000 ................. 12.00 27,000 ................ 55.75 <br />3,0OD ............... 13.75 28,000 ............... 57.50 <br />4,000 ................ 15.50 29,000 ................ 59.25 <br />5,000 ............... 17.25 30,000 ................ 61.00 <br />6,000 .............. 19.00 31,000 ---: ............ 62.75 <br />7,000 ............... 20.75 32,000 ................ 64.50 <br />8,000 ................ 22.50 33,000 ............... 66.25 <br />9,000 .............. 24,25 34,000 ............... 68.00 <br />10,000 ............... 26.00 35,000 ................ 69.75 <br />11,000 ............... 27.75 36,000 ............... 71.50 <br />12,000 ................ 29.50 37,000 ................ 73.25 <br />13,000 ................ 31.25 38,000 ................ 75.00 <br />14,000 ................ 33.00 39,000 ................ 76.75 <br />15,000 ................ 34.75 40,000 ............... 78.50 <br />]6,000 ................ 36.50 41,000 ................ 80.25 <br />17,000 ................ 38.25 42,000 ................ 82.00 <br />18,000 ................ 40.00 43,000 ................ 83.75 <br />19,000 ................ 41.75 44,000 ................ 85.50 <br />20,000 ................ 43.50 45,000 ................ 87.25 <br />21,000 ................ 45.25 46,000 ................ 89.00 <br />22,000 ................ 47.00 47,000 ................ 90.75 <br />23,000 ................ 48.75 48,000 ................ 92.50 <br />24,000 ................ 50.50 49,000 ............... 94.25 <br />25,000 ................ 52.25 50,000 ................ 96.00 <br /> <br />*HINIDf[~ FEE <br />**ALL ABOVE $50,000 RILL BE $1.00 FOR EACH ADDITIONAL TNOUSAR~. <br /> <br />NOTE: THIS FEE SCHEDULE OR $30.00 PER SQUARE FOOT, 6~ICHEVER IS GREATER. <br />THERE RILL BE A $10.00 FEE PER EACH DAY CARE INSPECTION. <br /> <br />INSULATION FEES: <br /> <br /> RESIDENCE - $10.00 <br /> COmmERCIAL- DETERHINED BY ABOVE FEE SCHEDULE. <br /> <br />THERE RILL BAA TEN DOLLAR ($10.00) RE-INSPECTION CHARGE FOR ANY RETURN TRIP <br />TO A JOB SITE, IF THE CONTRACTOR) SUB-CONTRACTOR OR OUNER IS AT FAULT FOR <br />THE RE-INSPECTION. <br /> <br /> <br />