Laserfiche WebLink
PRO3ECT COST SUMMARY <br /> <br /> The seven projects are listed below'with their estimated costs and number <br /> of customers served. <br /> <br /> Project Estimated Cost Customers <br /> Roberta Church Road $1~070,500 355 <br /> Kannapolis 1~935~900 987 <br /> Weddington/Pitts School Rd. 661~//50 //50 <br /> NC 73 1~061~800 372 <br /> Rock Hill Church/Poplar Tent Rd. 1,133~050 730 <br /> NC #9 1,117~#00 300 <br /> Midland 1,660~900 //80 <br /> Subtotal Construction Cost $8,6//1~000 3,67// <br /> Gontlngencies 86//1000 <br /> Ganstruction Cost $9~505,000 <br /> <br /> Engineering 603~000 <br /> Legal/Administrative 25~000 <br /> Land 10~000 <br /> Equipment 83,000 <br /> Interest During Goostructi0n 83#~000 <br /> <br />Total Project Cost $11~060~000 <br /> <br />The estimated additional cost required to serve the non-benefitted users is <br />approximately $200~000. <br /> <br />['A NON-BENEFITED USER is a non-farm'customer with a water tap over <br />3///" in size. The Farmer's Home Administration (FmHA) can only help <br />through grant funds farmers and other customers with water taps 3///" or <br />smaller. The $1~//26~000 grant from FmHA is used to keep the benefited <br />user rates below what would normally be required to pay back the water <br />loanJ. <br /> <br /> 10 <br /> <br /> <br />