My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19841105
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1984
>
AG19841105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:13:54 AM
Creation date
11/27/2017 12:13:22 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/5/1984
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(a) Ninety percent (90%) of the total compensation payable <br /> periodically during the construction period. <br /> <br /> (b) Ten percent (10%) of the total compensation upon final <br /> approval of the project by the OIqNER AND FmHA and com- <br /> pletion by the ENGINEER of all the requirements of this <br /> contract, <br /> <br />2. The resume of the inspector(s) to be assigned to a project will <br />be submitted for approval of the O~ER and FmHA two weeks prior to <br />the date of the preconstruction conference and the approved <br />inspector(s) will attend the preconstruction conference. <br /> <br />3. The compensation for basic engineering services and for <br />resident inspection shall be full and total pa)~ent to the <br />ENG1NFER for the project unless special services are required <br />as specified below or in SECTION D. Compensation for special <br />services will be in accordance with the contract. <br /> <br />Oh~ER~S INITIAk <br /> <br />ENGINEER'S INITIAL <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.