STATUS AS OF AMOUNT EXPENDE
<br /> COUNTY ROAD DESCRIPTION AMOUNT APPROVED THIS TIME TO DATE
<br />
<br />CABA}L~US SR 1782 Grade, drain, base, pave, $ 11,130.00 *~ Completed ~ 12,702.31
<br />(6.6~2284) e~-osion control and pavement (state funds)
<br /> ~mrking, SR 1782 from SR 177' $ ~,700.OO
<br /> to dead end, 0.22 mile. (property owners'
<br /> participation)
<br />
<br />CABAI~{U$ SR 1818 Grade, drain, base, pave, $ 54,592.00 ~ Complete except striping. $ 53,799.88
<br />(6.662285) erosion control and pavement (53,592.00)*~:'
<br /> marking. SI{ 1818 from SR ( 1,000.00)~'.'
<br /> 1600 to dead end, 0,75 mile.
<br />
<br />CABARRUS SR 2476 & Grade, drain, tame, pave, $ 50,O19.00 *" Completed $ ;t2,979.83
<br />(6,662286) SH 2;~76 ex~ ePosion contPoi and pavement
<br /> marking, SR 2476 & SR 2476
<br /> ext. from NC 73 to dead end
<br /> 0.70 mile.
<br />
<br />CABARRUS SIt 1;I14 Widen SR 11114 from US 29 to $ 35,441.00 "* Completed $ 20,926.72
<br />(6.662287) SR 1431, O.77 mile.
<br />
<br />CAB~RUS SR 1~131 Widen SR 1431 from SI{ 1414 ~. 13,584.00 ** Completed $ 12,5~O.20
<br />(6.662288) to Cabarm~s Countpy Club
<br /> Drive, 0.28 mile.
<br />
<br />CABAiKqUS Stt 1856 Grade, drain, base, pave, $ 20,573.00 ~ Completed $ 2~,693.75
<br />(6.662289) and erosion contro3, SR (state funds)
<br /> 1856 from SR 1621 to dead $ 8,720.00
<br /> end, O. ltl mile. (property owners'
<br /> participation)
<br />
<br />CAB;~{i(US S~{ 2471~ Grade, drain, base, pave, an $ 8,217.35 ~* Complete except erosion $ 9,316.O2
<br />(6.662290) erosion c. ntrol, SR 21~74 fro (etate l'mlds) control,
<br /> end of existing pavement to $ 3,590.00
<br /> dead end, O.17 mile. (pr0pe~ty owners'
<br /> participation)
<br />
<br />
<br />
|