My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19830502
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1983
>
AG19830502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:13:47 AM
Creation date
11/27/2017 12:13:49 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
5/2/1983
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cabarrus Count), Commission <br /> April 28, 1983 <br /> Psge Two <br /> <br /> ProRrsm Analysis - Will require organizing existing department <br /> functions and program data into defined spsce requirements <br /> and identification of circulstion and functional <br /> inter-relationships between departments. <br /> (2 Hours) <br /> <br /> Code Review - To determine what items of work will be <br /> required to bring the existing building into compliance <br /> with current codes, i.e., stairs, elevators, handicap <br /> access, toilets, Compliance with energy code, etc. <br /> (1 Hour) <br /> <br /> Space Utilization Study - To include area and functional <br /> design studies and sketches to determine the sdaptability <br /> of the existing building to each department's functional <br /> and circulation requirements, and space requirements <br /> for stairs, elevators, toilets, mechanical and electrical <br /> services. <br /> (4 Hours) <br /> <br />Anslysis of Building Systems and blaterials - Recommendations <br /> of appropriate building mechanical sad electrical <br /> systems. Recommendations of floor, walls, ceiling and <br /> roof materials systems to be used in restoration of <br /> new facility. Determinstioa of insurance rate schedale <br /> reductions and payback period for installing a sprinkler <br /> system. <br /> (2 Hours) <br /> <br />Site Survey - Review of existing site conditions to determine <br /> scope of site work required to provide parking, adequate <br /> site drainsge, grading and/or retaining wall requirements. <br /> (1 Hour) <br /> <br />~roject Cost Projections - To include a tabulation of <br /> projected project cost for coastru.ction, professional <br /> fees, and contengency. <br /> (2 Hoers) <br /> <br />Written Report - Submission of a written report to summarize <br /> the results of our investigation and proposed recommendations. <br /> (8 Hours) <br /> <br />Presentation of Report - Presentation of the written report <br /> before the County Commissioners and blanager for their <br /> review and comments. <br /> (2 ltours) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.