My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19831017
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1983
>
AG19831017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:13:48 AM
Creation date
11/27/2017 12:14:13 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/17/1983
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAB~EE~S COIlNT~ WAT~:R TRANSMISSION FACiLitiES <br /> <br /> Name of Contractor Total Bid <br /> <br /> ~ C. F. W. Construction Co,, Inc. ~$358,975.00 <br /> R.D.R., Inc. 366,748.00 <br /> R. F, Shinn Contractors, Inc. 371,312.61 <br /> Propst ConstrUotion CO., Inc. 393,035.00 <br /> Dellimger, Inc. 397,379,50 <br /> Hall Contracting Corp. 399,999.00 <br /> Sander8 BrOthers, lac. 403,2i5.00 <br /> Rand ConstructiOn Co., Inc. 406,865.00 <br /> W. M. Paris & Associates, Inc. 421,330.50 <br /> gitchie Construction Co., Inc. 422,367.40 <br /> <br /> The apparent low bidder at the bid opening remained the low.bidder after <br /> the bids had been checked and certified. See tabulation of bids attached <br /> to this report for a detailed breakdown of unit prices. <br /> <br /> We recon~end that the County Commigsioners accept all bids received, and <br /> that the contract be awarded to C, F. W. Construction Co., Inc. in the <br /> amount of $358,975.00.. <br /> <br /> Based on the low bid received for this contract, we estimate the total <br /> project coat to be: <br /> <br /> Description of Cost Cost Estimate <br /> <br /> Construction cost $353,975,00 <br /> Engineering Design & Administration 26,300.00 <br /> Engineering Inspection 16,900.00 <br /> Legal and AdministratiVe 6,000.00 <br /> Contingencies ... 40~000.00 <br /> $448,175.00 <br /> <br /> The total estimated project cost of $448,175.00 based on bids received <br /> leaves approximately $135,000 remaining in the budget unobligated. ~lese re- <br /> maiming funds could be used for additional construction of facilities which <br /> would enable the County to serve additional customers. The proposed lines could <br /> be extended up Pitts School Road to serve additional customers along and <br /> <br />adjacent to Pitts School Road. With the funds available, lines could be ex- <br />tended ~o serve approgir0ate~y half of the mobile home park to the west of Pitts <br />/ School Road (approximately 100 customers) or a small portion of Quail itollow <br />~ ~ subdivision Which borders Pitts School Road and Weddington Road (approximately <br /> 6s custom, rs). <br /> <br /> It is our recomendatlon that these two areas be studied es to the needs and <br /> de,ire for service and that the additional lines be added to the proposed con- <br /> t~act with CFW Constr~ction Co. through the normal change order process. <br /> <br /> Respectfully submitted, <br /> <br /> r~Ul C. Watson, J~ P. g. <br /> Project Manager <br /> Environmental Engineering Division <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.