Laserfiche WebLink
CABARRUS COUNTY <br /> <br /> COliSTRUCT~OII COST ESTIF, ATE <br /> <br /> PROPOSED W/kTER FACILITIES <br /> <br /> FOR <br /> <br /> PITTS SCHOOL ROAD - TA¥-NOR SUBDIVISION <br /> <br /> Item Quantity Unit Unit Cost Total Cost <br /> <br />12-inch Waterline 4,100 LF 15.00 $ 61,500 <br />12-inch Gate Valve 2 Ea 750.00 1,500 <br />6-inch Water Line 7,700 LF 7.DD 53,900 <br />6-inch Gate Valve 10 Ea 350.00 3,500 <br />Fire I{ydrant 9 Ea gDo. B0 8,100 <br />12-3/4" SPC Bored 200 LF 40.00 8,000 <br />Pavement Replacement 800 LF 8.00 6,400 <br />SVC Connections 75 Ga 300.00 22,500 <br />Air Release Valve I Ea 800.00 800 <br /> <br /> Subtotal $ 166,200 <br /> Contingencies 16,800 <br /> <br /> Subtotal Construction Cost $ 183,000 <br /> Engineering 20,ODD <br /> <br /> $ 203,000 <br /> <br /> ~-L- { <br /> <br /> <br />