Laserfiche WebLink
" TABLE 5 <br /> <br /> PROJECTED WATER USE 2010 <br /> <br /> Projected Current Projected Avg. Projected Max1 <br /> Pop. 2010 Use (gpcd) Water Needs (MGD). Daily Demand <br />Served Pop. 76,730 257 19.7 25.6 <br />Other PoP. 62,440 73.5 4.6 6.0 <br /> <br />1Average Day '1.3 (1.3 is based upon current system records.) <br /> <br /> TABLE 6 <br /> <br /> S~RY OF COST ESTIMATES <br /> <br /> Construction 20-Year Pumping Present Value <br /> <br />Groundwater $ 5,400,000 $55,269,230 $9,416,670 <br /> <br />Rocky River -0- $23,280,226 $3,519,840 <br />(Surface Source) <br /> <br /> Coddle Creek $14,408,172 -0- $2,141,050 <br /> (Impoundment) <br /> <br /> Dutch Buffalo $ 4,182,000 -0- $ 621,450 <br /> (Impoundment) <br /> <br /> -18- <br /> <br /> <br />