Laserfiche WebLink
[ <br /> <br /> ALTERNATE <br /> CABARRUS COUN~' <br /> <br />Estimate of cost to v~den SR 1~1~, Rock Hill Church Road from US 29 to SR <br />from a 17' pavement to a 22' pavement. Length 1t,060' - 0.77 mile. <br /> <br /> ~radin$ at $~0,3~0,00 per ~dle <br /> $20,350.00 X 0.77 $15,670.00 <br /> <br />Base material at 4671 lbs~ C. Y. at $5,75 ton <br /> <br /> ?,060' X 6' X 0.6667' X ~67~ X <br /> 27 X 2,000 8,078.00 <br /> <br /> Pave New Work at $1.~0 S. Y. <br /> ~,060' X 5' X $1.30 <br /> 9 = 2,932;00 <br /> <br />Resurface 22' Width at $0.65 S. Y. <br /> <br /> .4~060' X 22' X $0.62 S. Y. <br /> 9 = 6,h51.00 <br /> <br />Seedin~ at $2,500.00 per ~mile <br /> <br /> $2,5OO. OO X 0.77 = 1,925.00 <br /> <br />Stripin~ at $~00.00 per mile <br /> <br /> $500.00x 0.77 385.00 <br /> <br /> TOTAL $35,~41.00 <br /> <br />NOTE: Estimate does not include funds for relocating power poles, or telephone <br /> poles, etc. <br /> <br /> <br />