Laserfiche WebLink
121 <br /> <br /> UPON MOTION of Commissioner McClary, seconded by Commissioner <br />Hammett and carried, the bid was awarded to Fligel's Uniform <br />Company, the low bidder. <br /> <br /> UPON MOTION of Commissioner Cook, seconded by Commissioner <br />McClary and carried, the following people were appointed to the <br />Firemen's Relief Fund for the respective Volunteer Fire Departments: <br /> <br />North East VFD <br /> <br />Mt. Mitchell VFD <br /> <br />Holly Lentz <br />Howard Boger <br /> <br />Eugene Propst <br />Ernest Troutman <br /> <br />One Year Term <br />Two Year Term <br /> <br />One Year Term <br />Two Year Term <br /> <br /> UPON MOTION of Commissioner Milloway, seconded by Commissioner <br />Hammett and unanimously carried, Blanche Howie was nominated to <br />the Regional Manpower Advisory Committee to fill a term expiring <br />August, 1978. <br /> <br /> UPON MOTION of Commissioner Milloway, seconded by Commissioner <br />Hammett and unanimously carried, the following road construction <br />budgets were approved as presented by Don Goins, Assistant Division <br />Engineer, DOT, and T. L. Patterson, District Engineer, DOT: <br /> <br /> 1977-78 SECONDARY BOND CONSTRUCTION <br /> <br />TOTAL ALLOCATION $ 196,912.00 <br /> <br />Reserve 15% for Property Owners' Participation, <br />Additions and Contingencies $ 29,537.00 <br /> <br /> Reserve 10% Bridge Replacements $ 19,691.00 <br /> Reserve 25% Widening Projects $ 49,228.00 <br /> Reserve 50% Regular Secondary Unpaved $ 98,456.00 <br /> PROPOSED PROJECTS <br /> <br /> Pr. No. 6 SR 1128 Joe Page Road, Grade, Drain, <br /> Base, Pave, Seed and Pavement Markings. <br /> From SR 1127 to a dead end. Length 0.50 <br /> mile 27,724.50 <br /> <br /> Pr. No. 7 SR 2610, Jake Hahn Road, Grade, Drain, <br /> Base, Pave, Seed and Pavement Markings, <br /> from SR 2618 to SR 2612. Length 1.20 miles 66,116.40 <br /> <br /> Pr. No. 8 SR 2669, Page Road, Grade, and Base from <br /> SR 2660 to a dead end. Length 0.20 mile 4,615.10 <br /> <br /> Build bridge approaches and replace bridge <br /> No. 301, on SR 2608, Lipe Road 11,000.00 <br /> <br /> Build bridge approaches and replace bridge <br /> No. 134 on SR 2416, Cold Springs Road 8,500.00 <br /> <br /> SR 2635, Old Airport Road, widen from 17' <br /> to 22' Construction to consist of grading, <br /> draining and paving from US 601 Bus. to SR <br /> 2636. Length 1.60 miles 48,151.29 <br /> <br /> <br />