My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 1985 03 18
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
BOC
>
1985
>
BC 1985 03 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2002 3:15:56 PM
Creation date
11/27/2017 12:33:29 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
3/18/1985
Board
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
199 <br /> <br />In witness whereof, the parties hereto, acting under authority of their <br />respective governing bodies, have caused this contract to be duly <br />executed in ~ counterparts, each of which shall constitute an original. <br /> <br />Attest: <br />/s/ Frankie--F. Small <br /> <br />Clerk to the Board <br /> <br />Attest: <br />/s/ Frankie F. Small <br /> <br />Clerk <br /> <br />Seller: <br />Cabarrus County <br />By /s/ James W. Lentz <br /> <br />Title Chairman, Board of Commissioners <br /> <br />Purchaser: <br />Water & Sewer District of Cabarrus County <br /> <br />By /s/ James W. Lentz <br /> <br />Title Chairman of the Water & Sewer District <br /> <br />Commissioners <br /> <br />This contract is approved on behalf of the Farmers Home Administration <br />this day of ~, 19 . <br /> <br />By <br />Title <br /> <br />WATER & SEWER DISTRICT OF CABARRUS COUNTY <br /> WATER PURCHASE CONTRACT <br /> <br />ATTACHMENT NO. 1 <br /> <br />METERING POINTS <br /> <br />Point Construction Pressure Size of Location <br />No. Contract No. Main <br /> <br />1 1 35 psi 16" <br />2 1 45 psi 12" <br />3 2 50 psi 12" <br />4 3 100 psi 12" <br />5 4 75 psi 12" <br /> <br />NC 73 @ SR 1429 <br />SR 1394 @ SR 1567 <br />NC 49 @ SR 1139 <br />NC 73 @ SR 2408 <br />US 601 @ SR 1132 <br /> <br />ATTACHMENT NO. 2 <br /> <br />The connection fee shall be determined in each case after bids are <br />received and shall be based on the actual costs of construction <br />(including engineering fees) for the connection from the point of <br />tie-on to the existing system of the end of the lump sum bid item <br />for each master meter. <br /> <br />ATTACHMENT NO. 3 <br /> <br />In the event the water purchase contract is terminated, the District <br />has the following alternative supplies available: <br /> <br />Purchase water from the City of Mt. Pleasant. <br />Participate with the City of Concord in funding <br />the proposed impoundment and new water treatment <br />plant on Coddle Creek. <br />Purchase water from the Charlotte Mecklenburg <br />Utility Department. <br />Purchase water from the Stanly County Water System. <br />Construct a water treatment plant at the proposed <br />water shed structure No. 15 on Dutch Buffalo Creek. <br /> <br />If the total existing supply is terminated, items 1 and/or 4 above <br />would supply only a portion of the entire District needs. Should <br />the need arise, a detailed cost analysis of all options would be <br />done in order to select the most cost effective and practical <br />solution. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.