Laserfiche WebLink
565 <br /> <br />to the materials furnished or the manner of performing the work, the <br />County Engineer shall have authority to reject materials or suspend work <br />until the question at issue can be referred to and decided by the <br />Utility Director. It is further understood and agreed that the <br />Applicant shall remove any work or materials condemned as unsatisfactory <br />by the County Engineer and shall rebuild and replace same to the <br />standard required by the specifications, all at his own expense and in <br />default thereof, the same may be done by the County and the cost charged <br />against the Applicant. Final connection to the County's sanitary <br />sewerage system will not be permitted until all work has been approved <br />by the County Engineer. <br /> <br />It is understood and agreed that the Applicant and other parties may <br />discharge sewage into the proposed line or lines only under and in <br />accordance with the standard rules and regulations of the County, or as <br />such regulations may be amended, with reference to users of the County <br />Sewerage System, particularly with reference to the payment of standard <br />sewage service charges which are assessed by the County against users of <br />its sewerage system, provided that any parties discharging sewage into <br />the proposed line or lines and who do not obtain their water supply from <br />the Cabarrus County Utility Department shall meter their water system <br />with a metering device approved by the Cabarrus County Utility Depart- <br />ment, for the purpose of determining sewer service charges; such sewage <br />service charges shall be collected by and paid directly to the Cabarrus <br />County Utility Department. <br /> <br />Any connections, additions, or extensions to the herein described <br />sanitary sewer lines shall be made only upon written permission of the <br />County. Such connections, additions, or extensions of the herein <br />described sewer lines shall not be subject to any sanitary sewer con- <br />nection privilege fees payable to this agreement. <br /> <br />The Applicant shall obtain all rights-of-way in widths satisfactory to <br />the County Engineer where sewer lines are constructed across lands of <br />the Applicant or others and being located in other than a public way. <br />The Applicant or others and being located in other than a public way. <br />The Applicant shall show satisfactory evidence that he has obtained and <br />recorded in the Cabarrus County Registry, proper agreements covering <br />rights-of-way and that the same is free and clear of encumbrances. <br /> <br />The Applicant shall employ at his own proper cost and expense a <br />Professional Engineer registered in North Carolina who shall design, lay <br />out and supervise the construction of these certain sanitary sewer <br />lines, including any lift stations and force mains that may be required. <br />Complete plans and profiles detailing all proposed construction and <br />equipment must be approved by the County Engineer prior to beginning any <br />construction. Said construction plans shall be prepared to County <br />standard plan and profile. <br /> <br />The Applicant further agrees that upon approval of said Contractor and <br />sanitary sewer plans by the County Engineer, the owner of said <br />properties requesting sanitary sewer shall guarantee the installation of <br />the required sanitary.sewerage system. Upon completion of the sewerage <br />system as described, written notice thereof shall be given by the <br />Applicant to the County Engineer, who shall cause a final inspection of <br />the sewerage system to be made and shall within thirty (30) days accept <br />the system for the County, provided all stipulations of this contract <br />have been met. <br /> <br />After completion of all construction, the Applicant shall furnish the <br />original drawings of all construction plans, revised to show any and all <br />revisions encountered during construction, to the Cabarrus County <br />Utility Department marked "As-Built". The final plans shall show the <br />actual condition in which the facility was physically constructed and/or <br />installed. Further, the final plans shall show the correct location of <br />the facility as it relates to easements, right-of-way lines, property <br />lines, buildings, underground and/or overhead utility lines, roadways, <br />railroads, and all other physical features that would have any effect or <br />influence upon the constructed facility. The Professional Engineer <br /> <br /> <br />