My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 1986 11 01
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
BOC
>
1986
>
BC 1986 11 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2002 3:19:40 PM
Creation date
11/27/2017 12:33:54 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
11/1/1986
Board
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
557 <br /> <br />o <br /> <br />The Applicant is hereby granted permission to connect only those certain <br />sanitary sewer lines as hereinbefore described, at the certain location <br />or locations as previously described herein. The permission so granted <br />shall not be construed as granting permission for any additions or <br />extensions desired to be constructed by the Applicant or others; such <br />additions or extensions shall require a separate and new agreement <br />between the County and the parties desiring to make such additions or <br />extensions. <br /> <br />Ail construction pertaining to sanitary sewerage shall be performed by a <br />licensed Utility Contractor. The Applicant agrees to furnish the <br />Cabarrus County Utility Department with the name and license number as <br />listed with the North Carolina Licensing Board, of the Contractor who <br />has been retained to construct the before-described sewerage system. <br /> <br />The Applicant agrees to construct the sanitary sewer lines, including <br />any appurtenant structures and equipment, according to the Plans and <br />Profiles as approved by the County Engineer and in strict accordance <br />with the current specifications and design criteria of the Cabarrus <br />County Utility Department. The applicant also agrees to furnish prior <br />written notice to the County Engineer as to the exact date construction <br />will begin, and further agrees to furnish the County Engineer every <br />reasonable facility to ascertain whether or not the work as performed is <br />in accordance with the specifications. It is understood and agreed that <br />Inspectors employed by the County shall be stationed at the work to <br />report as to the progress and performance of the work, and shall be <br />authorized to inspect any part of the work done and any material fur- <br />nished, including its preparation or manufacture. No sewer pipe or <br />other appurtenance shall be placed except in the presence of the County <br />Engineer or his authorized Inspectors without special permission of the <br />Utility Director. Such Inspectors, however, shall not relieve the <br />Applicant from any obligation to perform all of the work strictly in <br />accordance with the Specifications. In case of any disputes arising as <br />to the materials furnished or the manner of performing the work, the <br />County Engineer shall have authority to reject materials or suspend work <br />until the question at issue can be referred to and decided by the <br />Utility Director. It is further understood and agreed that the Appli- <br />cant shall remove any work or materials condemned as unsatisfactory by <br />the County Engineer and shall rebuild and replace same to the standard <br />required by the specifications, all at his own expense and in default <br />thereof, the same may be done by the County and the cost charged against <br />the Applicant. Final connection to the County's sanitary sewerage <br />system will not be permitted until all work has been approved by the <br />County Engineer. <br /> <br />It is understood and agreed that the Applicant and other parties may <br />discharge sewage into the proposed line or lines only under and in <br />accordance with the standard rules and regulations of the County, or as <br />such regulations may be amended, with reference to users of the County <br />Sewerage System, particularly with reference to the payment of standard <br />sewage service charges which are assessed by the County against users of <br />its sewerage system, provided that any parties discharging sewage into <br />the proposed line or lines and who do not obtain their water supply from <br />the Cabarrus County Utility Department shall meter their water system <br />with a metering device approved by the Cabarrus County Utility Depart- <br />ment, for the purpose of determining sewer service charges; such sewage <br />service charges shall be collected by and paid directly to the Cabarrus <br />County Utility Department. <br /> <br />Any connections, additions, or extensions to the herein described <br />sanitary sewer lines shall be made only upon written permission of the <br />County. Such connections, additions, or extensions of the herein <br />described sewer lines shall not be subject to any sanitary sewer <br />connection privilege fees payable to this agreement. <br /> <br />The Applicant shall obtain all rights-of-way in widths satisfactory to <br />the County Engineer where sewer lines are constructed across lands of <br />the Applicant or others and being located in other than a public way. <br />The Applicant or others and being located in other than a public way. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.