Laserfiche WebLink
237 <br /> <br />$1,000.00 to verify compliance with County specifications as to quality of <br />materials and installation; (3) Withholding of all payment until work is <br />completed and verified. The Board indicated that it would consider this <br />proposal next spring. <br /> Mr. Paul Watson, Engineer with }{DR Infrastructure, Inc. of North Carolina, <br />reported that he had located property for the construction of a water tank on <br />Rock Hill Church Road but was still looking for property in the Irish Potato <br />Road area. Chairman Lentz asked Mr. Watson to proceed with the Rock Hill <br />Church Road area work as soon as possible in order to alleviate the low <br />pressure water problems in that community. <br /> There being no further business to come before the Board, the meeting was <br />adjourned at 5:55 P.M. <br /> <br />Clerk to the Board <br /> <br /> <br />