My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 1988 08 15
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
BOC
>
1988
>
BC 1988 08 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2002 3:24:00 PM
Creation date
11/27/2017 12:34:29 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
8/15/1988
Board
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
465 <br /> <br />10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />County. Such connections, additions, or extensions of the herein <br />described sewer lines shall not be subject to any sanitary sewer <br />connection privilege fees payable to this agreement. <br /> <br />The Applicant shall obtain all rights-of-way in widths satisfactory to <br />the County Engineer where sewer lines are constructed across lands of <br />the Applicant or others and being located in other than a public way. <br />The Applicant or others and being located in other than a public way. <br />The Applicant shall show satisfactory evidence that he has obtained <br />and recorded in the Cabarrus County Registry, proper agreements <br />covering rights-of-way and that the same is free and clear of encum- <br />brances. <br /> <br />The Applicant shall employ at his own proper cost and expense a <br />Professional Engineer registered in North Carolina who shall design, <br />lay out and supervise the construction of these certain sanitary sewer <br />lines, including any lift stations and force mains that may be re- <br />quired. Complete plans and profiles detailing all proposed construc- <br />tion and equipment must be approved by the County Engineer prior to <br />beginning any construction. Said construction plans shall be prepared <br />to County standard plan and profile. <br /> <br />The Applicant further agrees that upon approval of said Contractor and <br />sanitary sewer plans by the County Engineer, the owner of said <br />properties requesting sanitary sewer shall guarantee the installation <br />of the required sanitary sewerage system. Upon completion of the <br />sewerage system as described, written notice thereof shall be given by <br />the Applicant to the County Engineer, who shall cause a final <br />inspection of the sewerage system to be made and shall within thirty <br />(30) days accept the system for the County, provided all stipulations <br />of this contract have been met. <br /> <br />After completion of all construction, the Applicant shall furnish the <br />original drawings of all construction plans, revised to show any and <br />all revisions encountered during construction, to the Cabarrus County <br />Utility Department marked "As-Built". The final plans shall show the <br />actual condition in which the facility was physically constructed <br />and/or installed. Further, the final plans shall show the correct <br />location of the facility as it relates to easements, right-of-way <br />lines, property lines, buildings, underground and/or overhead utility <br />lines, roadways, railroads, and all other physical features that would <br />have any effect or influence upon the constructed facility. The <br />Professional Engineer employed to design the facility shall be respon- <br />sible for the accuracy and completeness of the facility as shown on <br />the final edition of the original construction plans. These original <br />drawings shall become the property of the County. <br /> <br />It is further understood and agreed that if any of the above described <br />sewer lines are served by or connected in any manner to pressure lines <br />of lift stations, the design of such pressure lines and lift stations <br />shall be in accordance with the requirements of the Cabarrus County <br />Utility Department and shall be designed to cover any future expansion <br />necessary to accommodate all anticipated flows in the drainage area in <br />which the lines are located. <br /> <br />It is understood and agreed that when the described sewer system is <br />constructed according to the plans, specifications, and standards of <br />the Cabarrns County Utility Department, said sewer system shall <br />automatically become the property of the County without cost to the <br />County, and without further agreement in connection therewith. <br /> <br />The Applicant, having constructed the aforesaid sanitary sewer at his <br />own proper cost and expense and outside the County's standard policy <br />for sewer extensions, agrees to waive all claims for compensation or <br />monies refundable for any capital facilities constructed. <br /> <br />Indemnification of the County. The Contractor/Developer will indemnify, <br />hold harmless and keep harmless, the County and its agents and employees <br />from and against all claims, damages, losses and expenses - including <br />attorney's fees - arising out of or resulting from the performance of <br />the work, provided that any such claim, damage, loss or expense is <br />attributable to bodily injury, sickness, disease or death, or to <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.