Laserfiche WebLink
242 <br /> <br /> (c) 'KANNAPOLIS shall pay to CABARRUS the KWG Expense,.'less the <br /> sum of $25,000.00 disbursed to CABARRUS by Atlantic American <br /> Properties, Inc., under the provisions of Paragraph 7.13.2 of the <br /> KWG Acquisition Agreement, and CABARRUS shall deliver to KANNAPOLIS <br /> copies of all engineering or other studies i~ process or completed <br /> regarding the KWG Water System prepared by HDR Engineering of North <br /> Carolina, Inc., project engineers for the Reservoir; and <br /> (d) Subject to the provisions of Paragraphs 9 and 10, for the <br /> sum of One Dollar ($1.00), CABARRUS shall lease to KANNAPOLIS that <br /> portion of the KWC Real Property set forth and described in "Exhibit <br /> B" attached hereto and incorporated herein by reference. The lease <br /> shall commence on the' Closing Date and shall terminate on the <br /> Completion Date. <br /> 6. Acknowledgment of and Compensation for Historic Floor Amount for <br />KANNAPOLIS and Designation as Customer of the Reservoir. As consideration to <br />KANNAPOLIS, as the successor to KWC, for KWG's historic usage of raw water from <br />Coddle Creek, as withdrawn through the Existing Pump Station or otherwise, upon <br />the Completion Date, CABARRUS hereby designates KANNAPOLIS as a customer of the <br />Reservoir and reserves and grants to KANNAPOLIS a right of first refusal to Two <br />Million(2,000,000) gallons per day of the available yield (the"Historic Floor <br />Amount" for KANNAPOLIS) at the AME rate set forth in Paragraph 3(a), but such <br />yield amount shall not be accumulated. <br /> 7. Additional Raw Water Authorization. Upon the Completion Date, in <br />addition to its Historic Floor Amount, CABARRUS grants to KANNAPOLIS, together <br />with other customers, if any, the non-exclusive, continuing right and authority <br />to withdraw, consume and receive raw water from the Reservoir, to the extent of <br />the net available yield thereof, subject to and limited only as follows: <br /> (a) In the event of the existence of maximum use conditions, drought <br />conditions (but only for the drought rationing period), or other objective <br />restrictive conditions requiring the rationing of the net available yield, <br />CABARRUS may limit the withdrawal, consumption and receipt of raw water by <br />KANNAPOL%S to a proportionate quota of the net available yield computed as <br />follows: <br /> KANNAPOLIS's average daily consumption of the net available yield <br /> from the Reservoir over the twelve (12) month period immediately <br /> preceding the declaration of the existence of such condition or <br /> conditions shall be divided by the total average daily consumption <br /> of all customers of the net available yield from the Reservoir, and <br /> the quotient thereof shall be multiplied by the Reservoir's net <br /> available yield, but such amount shall not be accumulated; and <br /> (b) Withdrawal, consumption and receipt of raw water by KANNAPOLIS in any <br />event will be limited to the maximum capacity of the existing pump station or <br />the new pump station constructed by GABARRUS. Any modification, expansion or <br />replacement of any or all portions of the existing pump station and/or the new <br />pump station or appurtenant facilities (the "Existing Raw Water Line") which <br />would result in additional withdrawal (or pumping) capacity above 2.6 MGD must <br />be submitted to CABARRUS for approval. CABARRUS reserves the right to regulate <br />the maximum withdrawal capacity for any and all of its customers at all times. <br /> (c) In any event, CABARRUS shall not be liable to KANNAPOLIS, in damages <br />or otherwise, for the failure to furnish raw water to KANNAPOLIS from the <br />Reservoir as set forth in Paragraphs 6 or 7 of this Agreement, or for the <br />quality of same, arising from the existence of any or all of the restrictive <br />conditions defined in Paragraph 3(n) that objectively preclude the delivery of <br />any or all raw water from the Reservoir, e.g. contamination, structural or <br />mechanical failure, act of God, or like conditions beyond the control of <br />CABARRUS. <br /> 8. Raw Water Charge. While KANNAPOLIS and CABARRUS acknowledge that the <br />Raw Water Charge may increase or decrease due to debt service, capital outlays, <br />and/or maintenance and operation costs for the Reservoir, for any and all raw <br />water drawn or received by KANNAPOLIS from the Reservoir, the Raw Water Charge <br />to KANNAPOLIS shall be no more than the lowest/best raw water rate, (whether <br />denominated bulk, industrial, institutional, commercial, residential or <br />otherwise) which CABARRUS charges to any of its customers from the Reservoir, <br />PROVIDED THAT: <br /> (a) for any Historic Floor Amount which CABARRUS establishes <br /> or acknowledges in this Agreement or otherwise, the Raw Water Charge <br /> therefor shall not be considered as a "lowest/best raw water rate" <br /> as identified in this paragraph; <br /> (b) for the Historic Floor Amount of KANNAPOLIS, the Raw Water <br /> Charge to KANNAPOLIS shall not exceed the AME as defined in <br /> <br /> <br />