Laserfiche WebLink
October 16, 2017 (Regular Meeting) Page 3335 <br /> the determining factor. However, the maximum distance shall not <br /> exceed 120 feet from the edge of the stream. For Lakes, ponds or <br /> impoundments, the buffer shall be computed using the high water <br /> elevation in place of the stream bank in the calculation. <br /> Ail <br /> t t <br /> PnM <br /> ISO" <br /> Pre-development elevation of Point 1 in feet = E1 <br /> Pre-development elevation of Point 2 in feet = E2 <br /> S = E2 - E1 (feet) x 100 <br /> 250 feet <br /> Top of <br /> Stream Bank <br /> ,1 'Z• II t <br /> 1 <br /> 50 feet 4 x slope <br /> Buffer <br /> Width = [50 + (4 x S) ] <br /> Minimum width: 50 feet (areas with flat slopes) <br /> Maximum width: 120 feet (areas with steep slopes) <br /> Top of <br /> Stream Bank <br /> BUFFER NO BUILD <br /> TOTAL BUFFER AREA REQUIRED <br /> b. T'e—s-iEe of an intermittent streeffi er Glass 2 eratorbedy buffer- <br /> Shall <br /> perpe nd-re}rl a r l y fe r a d i stanee e£ 39 €e e t en either s iee—ef th'e <br /> 8. All buffer areas shall remain in a natural, vegetated state. If the <br /> buffer area is wooded, it shall remain undisturbed. <br /> 9. When agricultural soil disturbing activities such as plowing, grading, <br /> ditching, excavating, placement of fill material, or similar <br /> activities must occur near the buffer zones, they shall conform to <br />