Laserfiche WebLink
August 19, 2013 (Regular Meeting) <br />Page 1667 <br />(27) Local Permit. A permit issued by WSACC allowing wastewater <br />discharge into the POTW pursuant to requirements in this ordinance <br />for users that do not meet the criteria of an SIU or propose to <br />discharge pump and haul wastes. <br />(28) Maximum Daily Discharge. The total concentration or mass of a <br />pollutant discharged from all production periods during a twenty - <br />four (24) hour calendar day. <br />(29) Medical Waste. Isolation wastes, infectious agents, human blood and <br />blood products, pathological wastes, sharps, body parts, <br />contaminated bedding, surgical wastes, potentially contaminated <br />laboratory wastes, and dialysis wastes. <br />(30) National Prohibitive Discharge Standard or Prohibitive Discharge <br />Standard or Prohibited Discharges. Absolute prohibitions against <br />the discharge of certain substances; these prohibitions appear in <br />Section 2.1 of this ordinance and are developed under the authority <br />of 307(b) of the Act and 40 CFR, Section 403.5. <br />(31) New Source. <br />(i) Any building, structure, facility, or installation from which <br />there is (or may be) a discharge of pollutants, the <br />construction of which commenced after the publication of <br />proposed Categorical pretreatment standards under Section <br />307(c) of the Act which will be applicable to such source if <br />such standards are thereafter promulgated in accordance with <br />section Section 307(c), provided that: <br />(A) the building, structure, facility, or installation is <br />constructed at a site at which no other source is <br />located; or <br />(B) the building, structure, facility, or installation <br />totally replaces the process or production equipment <br />that causes the discharge of pollutants at an existing <br />source; or <br />(C) the production or wastewater generating processes of <br />the building, structure, facility, or installation are <br />substantially independent of an existing source at the <br />same site. In determining whether these are <br />substantially independent, factors such as the extent <br />to which the new facility is integrated with the <br />existing plant, and the extent to which the new <br />facility is engaged in the same general type of <br />activity as the existing source, should be considered. <br />(ii) Construction on a site at which an existing source is located <br />results in a modification rather than a new source if the <br />construction does not create a new building, structure, <br />facility, or installation meeting the criteria of section <br />30(i)(B) or 30(i)(C) above but otherwise alters, replaces, or <br />adds to existing process or production equipment. <br />(iii) For purposes of this definition, construction of a new source <br />has commenced if the owner or operator has: <br />(A) Begun, or caused to begin as part of a continuous on- <br />site construction program: <br />(1) Any placement, assembly, or installation of <br />facilities or equipment; or <br />(2) Significant site preparation work including <br />clearing, excavation, or removal of existing <br />buildings, structures, or facilities which is <br />necessary for the replacement, assembly, or <br />installation of new source facilities or <br />equipment; or <br />(B) Entered into a binding contractual obligation for the <br />purchase of facilities or equipment which are <br />