Laserfiche WebLink
August 19, 2013 (Regular Meeting) <br />Page 1696 <br />(iii) Sampling must be performed in accordance with procedures set <br />out in section 5.11 of this ordinance and 40 CFR 403.12(b) <br />and (g) , including 40 CFR 403.12(g)(4). <br />(6) Certification. A statement, reviewed by the user's current <br />authorized representative as defined in Section 1.2(a)(3) and <br />certified by a qualified professional, indicating whether <br />pretreatment standards are being met on a consistent basis, and, if <br />not, whether additional operation and maintenance (0 &M) and /or <br />additional pretreatment is required to meet the pretreatment <br />standards and requirements. <br />(7) Compliance Schedule. If additional pretreatment and /or 0 &M will be <br />required to meet the pretreatment standards, the shortest schedule <br />by which the user will provide such additional pretreatment and /or <br />0 &M. The completion date in this schedule shall not be later than <br />the compliance date established for the applicable pretreatment <br />standard. A compliance schedule pursuant to this section must meet <br />the requirements set out in Section 5.2 of this ordinance. <br />(8) Signature and Certification. All baseline monitoring reports must <br />be signed and certified in accordance with Section 4.2(c) of this <br />ordinance. <br />5.2 Compliance Schedule Progress Reports <br />The following conditions shall apply to all industrial users, who are required <br />by WSACC to submit compliance schedules in conjunction with their baseline <br />monitoring reports, interim permit limits or enforcement orders: <br />(a) The schedule shall contain progress increments in the form of dates for <br />the commencement and completion of major events leading to the <br />construction and operation of additional pretreatment required for the <br />user to meet the applicable pretreatment standards (such events include, <br />but are not limited to, hiring an engineer, completing preliminary and <br />final plans, executing contracts for major components, commencing and <br />completing construction, and beginning and conducting routine operation); <br />(b) No increment referred to above shall exceed nine (9) months; <br />(c) The user shall submit a progress report to the Executive Director no <br />later than fourteen (14) days following each date in the schedule and the <br />final date of compliance including, as a minimum, whether or not it <br />complied with the increment of progress, the reason for any delay, and, <br />if appropriate, the steps being taken by the user to return to the <br />established schedule; and <br />(d) In no event shall more than nine (9) months elapse between such progress <br />reports to the Executive Director. <br />5.3 Reports on Compliance with Categorical Pretreatment Standard Deadline <br />Within ninety (90) days following the date for final compliance with applicable <br />categorical pretreatment standards, or in the case of a new source following <br />commencement of the introduction of wastewater into the POTW, any industrial <br />user subject to such pretreatment standards and requirements shall submit to <br />the Executive Director a report containing the information described in section <br />5.1(b)(4 -6) of this ordinance. For users subject to equivalent mass or <br />concentration limits established in accordance with the procedures in 40 CFR <br />403.6(c), this report shall contain a reasonable measure of the user's long- <br />term production rate. For all other users subject to categorical pretreatment <br />standards expressed in terms of allowable pollutant discharge per unit of <br />production (or other measure of operation), this report shall include the <br />user's actual production during the appropriate sampling period. All compliance <br />reports must be signed and certified in accordance with Section 4.2(c) of this <br />ordinance. <br />5.4 Periodic Compliance Reports <br />(a) All SIUs shall, at a frequency determined by the Executive Director but <br />in no case less than once every six months, submit a report indicating <br />