Laserfiche WebLink
August 19, 2013 (Regular Meeting) <br />Page 16-98 <br />the user to prevent similar future occurrences. Such notification shall <br />not relieve the user of any expense, loss, damage, or other liability <br />which may be incurred as a result of damage to the POTW, natural <br />resources, or any other damage to person or property; nor shall such <br />notification relieve the user of any fines, penalties, or other liability <br />which may be imposed pursuant to this ordinance. <br />(c) A notice shall be permanently posted on the user's bulletin board or <br />other prominent place advising employee's who to call in the event of a <br />discharge described in paragraph (a) , above. Employe shall ensure that <br />all employees, who may cause such a discharge to occur, are advised of <br />the emergency notification procedure. <br />(d) All SIUs are required to notify the POTW immediately of any changes at <br />its facility affecting the potential for spills and other accidental <br />discharge, discharge of a non - routine, episodic nature, a non- customary <br />batch discharge, or a slug load as defined in Section 1.2 (a) (54). <br />(e) WSACC shall evaluate whether the industrial user needs a plan to prevent <br />the recurrence of the discharge. Such a plan shall address, at a minimum, <br />the requirements set forth in Section 2.8 (b) (1 -4). <br />5.7 Reports from Unpermitted Users <br />All users not required to obtain a wastewater discharge permit shall provide <br />appropriate reports to the Executive Director as the Executive Director may <br />require. <br />All users classified as Non- Significant Categorical Industrial Users under <br />Section [1.2(a)(54)(F)] shall provide appropriate reports to the [POTW <br />Director] as the [POTW Director] may require. At a minimum, this shall <br />include the Annual Certification of continuing to meet the Non - Significant <br />Categorical Industrial User criteria as required under 40 CFR 403.12(q). <br />5.8 Reper Notice of Violation /Repeat Sampling and Reporting <br />(a) If sampling performed by a user indicates a violation of this <br />ordinance and /or applicable wastewater discharge permit, the user <br />must notify the Executive Director within twenty -four (24) hours <br />of becoming aware of the violation. The user shall also repeat <br />the sampling and analysis and submit the results of the repeat <br />analysis to the Executive Director within thirty (30) days after <br />becoming aware of the violation. If allowed by the Executive <br />Director, the user is not required to resample: <br />(i) if the Executive Director monitors at the user's facility <br />at least once a month; or <br />(ii) if the Executive Director samples between the user's <br />initial sampling and when the user receives the results of <br />this sampling. <br />(b) If the Executive Director has performed the sampling and analysis <br />in lieu of the industrial user gees - net — reeZrre the —aser- te <br />per €er and the POTW sampling of the user <br />indicates a violation, the Executive Director shall repeat the <br />sampling and obtain the results of the repeat analysis within <br />thirty (30) days after becoming aware of the violations, unless <br />one of the following occurs: <br />(i) the Executive Director monitors at the user's facility at <br />least once a month; or <br />(ii) the Executive Director samples the user between their initial <br />sampling and when the POTW receives the results of this <br />initial sampling; or <br />(iii) the Executive Director requires the user to perform sampling <br />and submit the results to the Executive Director within the <br />30 day deadline of the POTW becoming aware of the violation. <br />5.9 Notification of the Discharge of Hazardous Waste <br />