Laserfiche WebLink
October 10, 2013 (Board Retreat) <br />Page 1772 <br />Beverly Hills Elem <br />Replace carpet - 14 classrooms and main hallway front <br />entrance <br />150,000 <br />C A Furr Elem <br />Paint - throughout (interior and exterior) <br />35,000 <br />C A Furr Elem <br />Install canopy between buildings, including walkways <br />88,000, <br />C A Furr Elem <br />Additional lighting in car circle <br />25,000 <br />C C Griffin Middle <br />Install additional cameras and /or upgrade system <br />25,000 <br />C C Griffin Middle <br />Install awnings over 3 to 5 courtyard doors <br />17,000 <br />C C Griffin Middle <br />lInstall doors to divide gym and auxiliary gym <br />33,000 <br />C C Griffin Middle <br />1paint - classrooms (50`s) and gym <br />60,000 <br />C C Griffin Middle <br />Install canopy for car riders <br />88,000 <br />C C Griffin Middle <br />Construct storage building <br />55,000 <br />C C Griffin Middle <br />Replace carpet in classrooms <br />150,000 <br />C E Boger Elem <br />C E Boger Elem <br />Repair /add concrete at entire area at back exit doors on <br />main hall (water seeping under part of concrete) <br />Replace carpet in 8 classrooms <br />23,000 <br />40,000 <br />C E Boger Elem <br />Seal exterior masonry <br />110,000 <br />C E Boger Elem <br />Paint - interior and exterior <br />35,000 <br />Central Cabarrus High <br />Media center - walls to ceiling for separation <br />100,000 <br />Central Cabarrus High <br />Remodel and update Concessions building <br />16,500! <br />Central Cabarrus High <br />Replace dining room furniture <br />35,000 <br />Central Cabarrus High <br />Upgrade lighting in band room <br />40,000 <br />Central Cabarrus High <br />Replace all metal toilet partitions <br />110,000 <br />Central Cabarrus High <br />Replace ceiling tiles throughout building and remove <br />abandoned cable <br />122,0001 <br />Central Cabarrus High <br />Remove asbestos tile in classroom wings <br />198,000 <br />Central Cabarrus High <br />Upgrade branch circuit panels <br />175,000 <br />Central Cabarrus High <br />Upgrade stadium rest rooms <br />70,000 <br />Coltrane Webb Elem <br />Replace water heater and storage tank and piping in <br />kitchen area <br />15,000 <br />Coltrane Webb Elem <br />Renovate one Mobile Unit <br />15,000 <br />Coltrane Webb Elem <br />Construct greenhouse for magnet school <br />30,000 <br />Coltrane Webb Elem <br />Shelving /storage systems for classrooms <br />30,000 <br />Coltrane Webb Elem <br />Chairs; desks, and tables for 3 new classroom within next <br />3 years <br />45,000 <br />Concord High <br />Upgrade electrical services <br />30,000 <br />Concord High <br />Construct storage building (at rear of auxiliary gym) <br />165,000 <br />Concord High <br />Replace the boilers <br />125,000 <br />Concord High <br />Upgrade Stadium Rest Rooms <br />70,000 <br />Concord Middle <br />Install sidewalk for ADA accessibility to the ball fields <br />16,500 <br />Concord Middle <br />Repairs to field house due to structural deficiencies <br />140,000 <br />Concord Middle <br />Install stand alone HVAC system for the auditorium and <br />cafeteria <br />200,000 <br />Concord Middle <br />Replace carpet for front offices <br />45,000 <br />Concord Middle <br />Paint hallways, classrooms, doors and door frames <br />35,000 <br />Concord Middle <br />Construct storage building <br />55,000 <br />Cox Mill Elem <br />Wiring of 80 smart boards (board installation by CCS <br />Technology) <br />15,000 <br />Cox Mill Elem <br />Add additional gravel on rear access road <br />18,000 <br />Cox Mill Elem <br />Install canopy for bus riders <br />88,0001 <br />Cox Mill Elem <br />Replace gym lighting <br />15,0001 <br />Cox Mill Elem <br />Construct 1 pair of group restrooms <br />140,000, <br />Cox Mill Elem <br />Paint - hallways and classrooms (mainly classrooms and <br />exterior structural elements) <br />35,0001 <br />i <br />Cox Mill Elem <br />Replace carpet in hallways <br />85,000 <br />Cox Mill Elem <br />Repair casework <br />160,000 <br />Cox Mill Elem <br />Additional playing field <br />100,000 <br />Cox Mill High <br />Laminar FlowHood for Biotechnology Room x 4 <br />20,000 <br />Cox Mill High <br />Install tornado rated doors in 1600 science area <br />44,0001 <br />Cox Mill High <br />Replace main corridor door hardware school -wide <br />150,0001 <br />Cox Mill High <br />Install netting for baseball /softball fields <br />60,0001 <br />Cox Mill High <br />Install concrete steps from bus parking to lower level <br />35,000 <br />Cox Mill High <br />Construct storage building at practice fields <br />20,000 <br />Cox Mill High <br />Install Rubberized track <br />200,000; <br />Early College <br />Need a storage building. This can be a mobile unit. <br />20,000 <br />Education Center <br />Install cameras <br />44,000 <br />Education Center <br />Paint - throughout <br />60,000!, <br />Education Center <br />Remodel Administration Wing <br />70,000 <br />Education Center <br />Paint hallways, offices, doors and door frames <br />15,0001 <br />Education Center <br />Remodel Administrative Offices <br />60,000 <br />Education Center <br />Replace carpet in hallways <br />120,000 <br />Facilities Management <br />Fencing and gate at drive (to laydown yard) <br />55,000 <br />Facilities Management <br />Install cameras - laydown yard and building <br />44,000 <br />Glenn Center / <br />Opportunity <br />Replace fire alarm system <br />82,5001 <br />1 <br />Glenn Center / <br />Opportunity <br />Replace lighting in hallways, classrooms, and offices <br />165,000 <br />Glenn Center / <br />Opportunity <br />Paint - throughout <br />75,000! <br />Harold E. Winkler Middle <br />Concession Building /Announcer Booth <br />75,000 <br />Harold E. Winkler Middle <br />Additional Security Cameras for Hallway to Bus Lot, <br />Cafeteria per SRO <br />15,0001 <br />Harris Road Middle <br />Replace carpet in office area <br />20,000 <br />Harris Road Middle <br />Paint - interior and exterior <br />35,000 <br />Harris Road Middle <br />Remodel media center <br />80,000 <br />Harris Road Middle <br />Install four basketball goals in auxiliary gym <br />16,000 <br />Harris Road Middle <br />Install gym dividing doors <br />33,000 <br />Harris Road Middle <br />Install stand alone HVAC system for the gym and the <br />dining room <br />200,000 <br />Harrisburg Elem <br />Repair or replace PA system in the gym and cafeteria <br />10,000 <br />Harrisburg Elem <br />Replace blinds throughout school <br />15,000 <br />Harrisburg Elem <br />Replace all sinks in group rest rooms <br />20,000 <br />