Laserfiche WebLink
October 10, 2013 (Board Retreat) <br />Page 1774 <br />Pitts School Rd Elem <br />Paint hallways, classrooms, doors and door frames <br />35,000 <br />Pitts School Rd Elem <br />Replace water heater <br />14,000 <br />Pitts School Rd Elem <br />Pave access road behind school and add parking spaces <br />125,000 <br />Pitts School Rd Elem <br />Construct storage building <br />60,500 <br />• Brown McAllister Elem <br />Pave walkway between two playgrounds <br />35,000 <br />• Brown McAllister Elem <br />Extend sidewalk to mobile units behind school <br />12,000 <br />• Brown McAllister Elem <br />Paint hallways, classrooms, doors and door frames <br />15,000 <br />• Brown McAllister Elem <br />Install canopy to mobile units <br />33,000 <br />• Brown McAllister Elem <br />Paint - exterior (especially on front wall) <br />75,000 <br />• Brown McAllister Elem <br />Replace front corridor tile <br />100,000 <br />• Brown McAllister Elem <br />Renovate admin offices and kitchen <br />175,000 <br />Rocky River Elem <br />Install additional exterior lighting especially in <br />arking lot in front of cafeteria <br />17,000 <br />Rocky River Elem <br />Install separate HVAC for the kitchen <br />112,000 <br />Rocky River Elem <br />Freestanding bookcases for use in classroom <br />50,000 <br />Rocky River Elem <br />Install canopy for car riders <br />82,500 <br />Rocky River Elem <br />Replace carpet in classrooms <br />100,000 <br />Rocky River Elem <br />Replace the existing PVI water heater. <br />33,000 <br />Rocky River Elem <br />Replace carpet in hallways <br />85,000 <br />Rocky River Elem <br />Seal and stripe parking lots and drives <br />95,000 <br />Royal Oaks Elem <br />Replace windows <br />126,000 <br />Royal Oaks Elem <br />Replace mobile restroom <br />28,000 <br />Royal Oaks Elem <br />Install more asphalt as the topping coat <br />40,000 <br />Royal Oaks Elem <br />Replace VCT in hallway (including asbestos abatement) <br />60,000 <br />Royal Oaks Elem <br />Install asphalt at the area around Head Start <br />75,000 <br />• M Irvin Elem <br />Remedy erosion issues on back playground <br />10,000 <br />• M Irvin Elem <br />Redirect spring that is leaking across parking lot <br />25,000 <br />• M Irvin Elem <br />Replace carpet with VCT in hallways <br />100,000 <br />• M Irvin Elem <br />Install cameras <br />38,500 <br />• M Irvin Elem <br />Replacement of water heater <br />14,000 <br />• M Irvin Elem <br />Paint hallways, classrooms, doors and door frames <br />50,000 <br />• M Irvin Elem <br />Construct storage building <br />55,000 <br />• R Odell Elem <br />Install canopy to mobile units <br />22,500 <br />• R Odell Elem <br />Construct picnic shelter <br />26,500 <br />• R Odell Elem <br />Paint hallways, classrooms, doors and door frames <br />35,000 <br />• R Odell Elem <br />Replace water heater in 5 years <br />14,000. <br />Weddington Elem <br />Restripe bus lot and visitor lot <br />15,000i <br />Weddington Elem <br />Install canopy for ADA accessibility <br />50,000 <br />Weddington Elem <br />Upgrade cameras <br />38,500 <br />Weddington Elem <br />Replace broken blinds in various classrooms <br />20,000 <br />Weddington Elem <br />Repair warped cabinets throughout classrooms <br />50,000 <br />Weddington Elem <br />Add tack strips throughout hallways. <br />7,5001 <br />Weddington Elem <br />Paint - interior (hallways and classrooms) and exterior <br />35,000 <br />Weddington Elem <br />Replace carpet in classrooms and hallways <br />120,000 <br />Weddington Elem <br />Relocate rock storage building <br />3,000 <br />Weddington Elem <br />Replace water heater in 5 years <br />14,000 <br />Winecoff Elem <br />Covered walkway for students at bus circle <br />100,000 <br />Winecoff Elem <br />Covered walkway for students at car rider circle <br />120,000 <br />Winecoff Elem, <br />Replace fire alarm system <br />67, 2004 <br />Winecoff Elem <br />Seal and restripe parking lots and drives <br />95,000 <br />Winecoff Elem <br />Replace water heater in 5 years <br />14,000 <br />Winecoff Elem <br />Replace gym floor <br />165,000 <br />Wolf Meadow Elem <br />Install 2nd basketball hoop (maybe more) and padding on <br />walls in gym <br />20,000 <br />Wolf Meadow Elem <br />Replace ramps to dumpsters and mobiles <br />25,000 <br />Wolf Meadow Elem <br />Install RPZ backflow preventer on main water line <br />44,000 <br />Wolf Meadow Elem <br />replace broken and stained ceiling tiles <br />50,000 <br />Wolf Meadow Elem <br />finish half wall of room 126 <br />15,000 <br />Wolf Meadow Elem <br />Replace mobile unit doors and ramps and decks <br />32,000 <br />Wolf Meadow Elem <br />Repave parent drive and main drive <br />160,000 <br />Wolf Meadow Elem <br />Upgrade door hardware to ADA standards, replace doors & <br />add sweeps <br />200,000 . <br />Wolf Meadow Elem <br />paint gym <br />6,000 <br />Wolf Meadow Elem <br />repaint group bathrooms where paint is peeling <br />10,000 <br />Wolf Meadow Elem <br />Paint hallways, classrooms, door and door frames <br />35,000 <br />Wolf Meadow Elem <br />install doors in classrooms to close off the offices in <br />between classrooms <br />45,000 <br />Wolf Meadow Elem <br />Replace carpet in classrooms <br />50.000 <br />Wolf Meadow Elem <br />Enclose Media Center with permanent walls and update <br />lighting <br />70,000 <br />Wolf Meadow Elem <br />Install new boiler <br />75,000 <br />Wolf Meadow Elem <br />Replace exterior classroom doors <br />110,000 <br />Wolf Meadow Elem <br />replace classroom cabinetry <br />200,000 <br />Wolf Meadow Elem <br />Upgrade cameras <br />38,500 <br />Wolf Meadow Elem <br />Construct group rest room on cafeteria side <br />125,000 <br />Total <br />$15,353,900 <br />