Laserfiche WebLink
November 3, 2008 (Work Session) Page 1037 <br />Pam Dubois, Deputy County Manager, reported that as part of their FY 09 <br />budget process, Cabarrus County Schools allocated $1,000,000.00 of the Public <br />Schools Building Fund money to the School Technology Fund and the Cabarrus <br />County Board of Education authorized the transfer of these funds on October <br />1, 2008. She stated the Board's approval is required. <br />UPON MOTION of Commissioner Mynatt, seconded by Commissioner Carruth <br />and unanimously carried, the Board voted to place the Public School Building <br />Capital Fund transfer request for Cabarrus County Schools on the November 17, <br />2008 Agenda as a Consent item. <br />In response to a question posed by Commissioner Carruth, a brief <br />discussion ensued amongst the Board and Holly Blackwelder, Cabarrus County <br />School Board Chairman. The following issues were addressed: architects for <br />school projects and why an outside architect is necessary; fees connected <br />with architectural plans; cloned schools; etc. <br />Parks - Carrying of Concealed Handguns With a Permit in County Parks <br />John Day, County Manager, reported the Cabarrus County Code of <br />Ordinances was recently amended to allow the carrying of properly permitted <br />concealed handguns on County property, with the exception of County parks. <br />At the request of the Board, the Parks Commission considered the matter at <br />its October 16, 2008 meeting and unanimously decided not to allow concealed <br />weapons in County parks. <br />At the request of Commissioner Mynatt, Londa Strong, Parks Director, <br />explained the Parks Commission's rationale related to the need for handguns <br />in State and National Parks, but not County parks. A brief discussion <br />ensued. <br />No action was taken. <br />Sheriff's Office and Detention Center - Erosion Control Options <br />Mike Downs, Deputy County Manager, reviewed the following options <br />available to the Board to address erosion control issues at the Sheriff's <br />Office and Detention Center: <br />1) Engineered Block Wall (like what borders the retention pond <br />currently) Cost: $60,000.00 (this includes tree removal and parking <br />spaces, although the wall won't match the existing wall on Corban). <br />Onits shall be eight inches by eighteen inches by twelve inches <br />(8"x18"x12") grey block and. caps. <br />2) Phase I (Entire Island Area) area and Phase II (faces back of SD Admin) <br />and Phase III (facing future jail housing) with retaining wall that has <br />the raised "pillars" in them. This will involve tree removal <br />(estimated at $10,000.00). This will also include cutting out earth <br />and curbing on the island and adding 4-5 parking spaces ($10,000.00); <br />Cost: $235,000.00 <br />3) Phase I (Entire Island Area) but on Phase I and Phase II we simply cut <br />the earth to 3:1 slope and DO NOT put in a retaining wall there; <br />Cost: $170,000.00 (this would include island, tree removal, and extra <br />parking spaces) <br />9) Combination of #1 and #3 (includes tree removal, extra parking spaces <br />(5-6), decorative retaining wall with "pillars" around Phase I (island) <br />and then Phase II and Phase III is all engineered block wall: <br />Cost: $150,000.00 <br />Following the presentation, Mr. Downs responded to questions from the <br />Board. The following issues were addressed: seeding; landscaping; the <br />neighboring property owned by the Piedmont Preservation Society; the <br />likelihood of erosion prevention from each option; the budget; tree removal; <br />etc. <br />UPON MOTION of Commissioner Carruth, seconded by Commissioner Mynatt <br />and unanimously carried, the Board voted to place the Sheriff's Office and <br />Detention Center Erosion Control Options on the November 17, 2008 Agenda as a <br />New Business item. <br />Solid Waste - Proposed Landfill Expansion and Tipping Fee Increase <br />Rick Payne, Solid Waste Manager, presented information related to a <br />request for a proposed landfill expansion and tipping fee increase. He <br />stated the current landfill is projected to reach capacity in June or July of <br />2010 and the 6.5 acre expansion will allow the landfill to continue operation <br />