Laserfiche WebLink
May 17, £004 Page 441 <br /> <br />SCHEDULE B <br /> <br />Building permit for the alteration, demolition, remodel, removal, repair, re- <br />roofing, or reconstruction of any structure. This schedule also applies to <br />accessory buildings. <br /> <br />Value of Construction <br /> <br />Permit Fee <br /> <br />$0 $1,000 $25.00 <br />1,001 5,000 35.00 <br />5,001 15,000 75.00 <br /> <br />Estimated construction cost above $15,000 will be charged an additional $3.00 <br />per additional $1,000 value. <br /> <br />Callback Fee - A $50.00 callback fee will be charged for re-inspection for <br />any return trip to a site due to owner, contractor or sub-contractor being <br />unprepared for the original inspection. <br /> <br /> MECHANICAL PERMITS <br />UNIT/FIXTURE DESCRIPTION <br />A/C Units - 1 hp to 5 hp <br /> Greater than 5 hp constitutes and additional unit <br />Heating Units - 0 to 150,000 btu <br /> Greater than 150,000 btu constitutes an additional unit <br />Gas Piping <br />Boilers (150,000) <br />Thru-wall heating and cooling units <br />Wall furnace, Floor furnace, and Unit Heaters <br />Commercial Exhaust Hoods <br />Commercial Dryers <br />Replace Heating 0 (150,000-5t) (no duct work) <br />Cooling <br />Fan Coil (Heating and/or Cooling) <br />Conversion Burner (150,000) <br />Refrigeration <br />Duct Work <br />Replace heat <br />Replace air <br /> <br />FEES <br /> <br />$35.00 <br /> <br />$35.00 <br />$25.oo <br />$25.00 <br />$25.0o <br />$25 oo <br />$50 oo <br />$50 oo <br />$25 oo <br />$25 oo <br />$25 oo <br />$25 oo <br />$5o oo <br />$25 oo <br />$25 oo <br />$25 oo <br /> <br />There will be a $50.00 callback or re-inspection fee charged for any return <br />trip to a job site if the contractor, subcontractor, or owner is at fault. <br /> <br />Fees for projects, which have an estimated cost of more than $10,000.00 shall <br />be calculated using the Construction Schedule A for new construction and <br />Construction Schedule B for upfit. <br /> <br />ELECTRICAL AND MOBILE HOME PERMITS <br /> <br />SIZE OR TYPE OF SERVICE <br /> <br />60 Ampere Service <br />100 Ampere Service <br />125 Ampere Service <br />150 Ampere Service <br />200 Ampere Service <br />225 Ampere Service <br />250 Ampere Service <br />275 Ampere Service <br />300 Ampere Service <br />325 Ampere Service <br />350 Ampere Service <br />400 Ampere Service <br />Saw Service <br />Pools, Grounding and Wiring <br />Well Services and Signs <br />Change of Service <br /> <br /> FEES <br /> $40.00 <br /> $40 oo <br /> $40 oo <br /> $45 oo <br /> $55 oo <br /> $65 oo <br /> $75 oo <br /> $80 oo <br /> $85 oo <br /> $90 oo <br /> $90.00 <br />$120.00 <br /> $40.00 <br /> $40.00 <br /> $40.00 <br /> $40.00 <br /> <br /> Up to 200 amps service. Above 200 amps is based on size of service <br />HVAC Wiring $40.00 <br />LCD's Per Residence $40.00 <br />Miscellaneous Electrical Repair/ADD $40.00 <br />Temporary Power $125.00 <br /> <br />Means of calculating a greater rating shall be $120.00 for the first 400 <br />amperes plus .25 per each additional ampere. <br /> <br /> <br />