Laserfiche WebLink
April 15, 2002 Page 332 <br /> <br />There will be a fifty ($50.00/ callback or re-inspection fee charged for any <br />return trip to a job site if the contractor, subcontractor, or owner is at <br />fault. <br /> <br />CABARRUS COUNTY DEVELOPMENT SERVICES <br />BUILDING INSPECTIONS DIVISION <br />FEE SCHEDULE EFFECTIVE APRIL 15, 2002 <br />MECHANICAL PERMITS <br /> <br />UNIT/FIXTURE DESCRIPTION <br />A/C Units - lhp to 5 hp <br />Greater than 5 hp constitutes an additional unit <br /> <br />FEES <br /> <br /> $201o0 <br /> <br />Heating Units - 0 to 150,000 btu <br />Greater than 150,000 btu constitutes an additional unit <br /> <br />$20.00 <br /> <br />Gas Piping <br />Boilers (150,000) <br />Thru-wall heating and cooling units <br />Wall furnace, Floor furnace, and Unit Heaters <br />Commercial Exhaust Hoods <br />Commercial Dryers <br />Replace Heating - (150,000-5t) (no duct work) <br />Cooling <br />Fan Coil (Heating and/or Cooling) <br />Conversion Burner )(150,000) <br />Refrigeration <br /> <br />$16.00 <br />$16.00 <br />$19.00 <br />$16.00 <br />$31.00 <br />$31.00 <br />$16.00 <br />$16.00 <br />$~6.00 <br />$16.00 <br />$30.00 <br /> <br />There will be a fifty ($50.00) dollar callback or re-inspection fee charged <br />for any return trip to a job site if the contractor, subcontractor, or owner <br />is at fault. <br /> <br />Fees for projects which have an estimated cost of more than $10,000.00 <br />shall be calculated using the Construction Schedule B. <br /> <br />CABARRUS COUNTY DEVELOPMENT SERVICES <br />BUILDING INSPECTIONS DIVISION <br />FEE SCHEDULE EFFECTIVE APRIL 15, 2002 <br />PLUMBING AND FIRE SPRINKLER PERMITS <br /> <br />FIXTURES <br />First Fixture <br />Each additional fixture <br />Water Heater replacement <br />Water Service <br />Sewer Service <br />Water & Sewer Service <br />Fire Sprinkler <br />Moved House <br />Modular Home or Office <br /> <br />FEES <br /> $7.00 <br /> $5.00 <br /> $15.00 <br /> $~5.00 <br /> $15.00 <br /> $20.0o <br /> $12.00 plus .01 per sq.ft. <br /> $22.00 plus $20.00 W&S <br /> $22.00 plus $20.00 W&S <br /> <br />Water & Sewer Permit is required for new mobile home spaces. Ail new <br />lines must be inspected before they are covered. <br /> <br />There will be a fifty ($50.00) dollar callback or re-inspection fee <br />charged for any return trip to a job site if the contractor, <br />subcontractor, or owner is at fault. <br /> <br />Proposed Lease and Operations A~reement with the City of COncord for W. W <br />Flowe Park and Authorization to Rec~uest Voluntar~ Annexation to the City of <br />Concord ' <br /> <br /> Mr. Steve Little, Parks and Recreation Director, reviewed the proposed <br />Lease and Operations Agreement for the City of .Concord to program, manage and <br />maintain W. W. Flowe Park for a period of 20 years, with possible extension <br />for a second 20-year period. He estimated the total annual cost for Park <br />operation at approximately $175,000.00. The Concord City Council approved <br />the Agreement on March 28, 2002. <br /> <br /> <br />