Laserfiche WebLink
May 20, 2002 Page 356 <br /> <br />ITEW BUSINESS <br /> <br />Presentation of the Proposed 2002-2003 Secondar~ Road Construction Program <br />for Cabarrus County - 6~30 p.m. <br /> <br /> Mr. J. K. Wilson, III, P.E., District Engineer with the North Carolina <br />Department of Transportation, presented the proposed 2002-2003 Secondary Road <br />Construction Program for Cabarrus County. He explained the process for <br />rating unpaved roads and reported there are 22.71 miles of unpaved roads left <br />in Cabarrus County. <br /> <br /> The Department of Transportation published the Public Notice of the <br />scheduled program presentation in THE INDEPENDENT TRIBUNE on May 10 and 17, <br />2002. Also, the proposed program with county map was posted in the <br />Courthouse for public information. <br /> <br />The Program as presented by Mr. Wilson was as follows: <br /> <br /> CABARRUS COUNTY <br />2002-2003 Secondary and Trust Construction Program <br /> <br />Unallocated Balance 01-02 Regular Funds <br />Unallocated Balance 01-02 Trust Funds <br />2002-03 Regular Secondary Construction Funds (Estimated) <br />2002-03 Secondary Trust Funds (Estimated) <br />Total Available Funds (Estimated) <br /> <br />$ 130,400.00 <br /> 27,700.00 <br /> 374,000.00 <br /> 279,900.00 <br /> <br />$ 812,000.00 <br /> <br />Reserve Approximately 10% for Overruns, Road Additions, <br />Property Owner Participation Paving & Contingencies <br /> <br />$ 81,200.00 <br /> <br />Surveys and Right of Way Acquisition <br />Reserve 20% of Regular & Trust Funds for Maintenance <br />Total Deductions <br />Total Funds Available for 02-03 Secondary Construction <br /> <br />$ 30,000.00 <br />$ 130,780.00 <br />$ 241,980.00 <br /> <br />$ 570,020.00 <br /> <br />PROGRAM <br />MAP NO. <br /> <br /> DESCRIPTION <br />Change work order # 6.662055T to fully fund the <br />project per original estimate. SR 2452 (Culp Rd.) <br />from SR 2444 (St. Stephen's Ch. Rd.) to SR 2450 <br />(Gold Hill Rd. E). Paving Priority No. IF Rural. <br />Grade, drain, base, pave, and erosion control. <br />Length 0.9 Mi. <br /> <br /> AMOUNT <br />$75,000.00 <br /> <br />2 Change work order # 6.662056T to fully fund the $75,000'.00 <br /> project per original estimate. SR 2663 (Lowder <br /> Rd.) from NC 49 to SR 2450 (Gold Hill Rd.) <br /> Paving Priority No. 3F Rural. Grade, drain, base, <br /> pave and erosion control. Length 1.15 Mi. <br /> <br />3 SR 1231M (Lamar Rd.) from SR 1132 (Flowes $170,200.72 <br /> Store Rd.) to a Dead End. Paving Priority <br /> No. 3F Subdivision. Grade, drain, base, <br /> pave and erosion control. Length 0.7 Mi. <br /> <br />4 SR 2471 (Radcliffe Rd.) from SR 2415, NC 49 $ 89,525.20 <br /> ramp to Dead End. Paving Priority No. 4F <br /> Rural. Grade, drain, base, pave and erosion <br /> control. Length 0.26 Mi. <br /> <br />5 SR 2654 (Alderman Road) from SR 2411 (Cold $160,294.08 <br /> Springs Rd.) to Dead End. Paving Priority <br /> No. 5F Rural. Grade, drain, base, pave <br /> and erosion control. Length 0.70 Mi. <br /> (Partial Fund) <br /> <br />TOTAL PROGRAM <br /> <br />$570,020.00 <br /> <br />NOTE 1: If right of way cannot be obtained for one of the above roads, or if <br />additional funds are received, we will apply funds to the next road, or <br />roads, in priority order. <br /> <br />NOTE 2: Program subject to availability of funding, right of way and <br />environmental review. <br /> <br /> <br />