My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 1999 12 20
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
BOC
>
1999
>
BC 1999 12 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2002 3:44:55 PM
Creation date
11/27/2017 1:07:06 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
12/20/1999
Board
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
368 <br /> <br />Newly constructed open channels in HQW shall be designed <br />and constructed with side slopes no steeper than 2 <br />horizontal to 1 vertical if a vegetative cover is used for <br />stabilization unless soil conditions permit a steeper slope <br />or where the slopes are stabilized by using mechanical <br />devices, structural devices or other acceptable ditch <br />liners, in any event, the angle for side slopes shall be <br />sufficient to restrain Accelerated Erosion. <br />Ground Cover sufficient to restrain Erosion must be <br />provided for any portion of Land-Disturbing Activity in a <br />HQW zone within 15 Working Days or 60 calendar days <br />following Completion of Construction or Development, <br />whichever period is shorter. <br /> <br />Section 9 - Storm Water Outlet Protection <br /> a. Persons shall conduct Land-Disturbing Activity so that the post- <br /> construction Velocity of the Ten Year Storm runoff in the <br /> receiving watercourse to the Discharge Point does not exceed the <br /> greater of: <br /> 1. The Velocity established by the table in Paragraph (d) of <br /> this Section; or <br /> 2. The Velocity of the Ten Year Storm runoff in the receiving <br /> watercourse prior to the Land-Disturbing Activity. <br /> If conditions (1) or (2) of this Subsection cannot be met, then <br /> the receiving watercourse to and including the Discharge Point <br /> shall be designed and constructed to withstand the expected <br /> Velocity anywhere the Velocity exceeds the "prior to Land- <br /> Disturbing Activity" Velocity by ten percent (10%). <br /> b. Acceptable Manaqement Measures - Measures applied alone or in <br /> combination to satisfy the intent of this section are acceptable <br /> if there are no objectionable secondary consequences.. The NCSCC <br /> recognizes that the management of Storm Water Runoff to minimize <br /> or control downstream channel and bank Erosion is a developing <br /> technology. Innovative techniques and ideas will be considered <br /> and may be used when shown to have the potential to produce <br /> successful results. Some alternatives are to: <br /> 1. Avoid increases in surface runoff volume and Velocity by <br /> including measures to promote infiltration to compensate <br /> for increased runoff from areas rendered impervious. <br /> 2. Avoid increases in Storm Water Runoff discharge Velocities <br /> by using vegetated or roughened swells and waterways in <br /> lieu of closed drains and high velocity paved sections. <br /> 3. Provide Energy Dissipaters at outlets of Storm Drainage <br /> Facilities to reduce flow Velocities to the point of <br /> discharge. These may range from simple rip-rapped sections <br /> to complex structures. <br /> 4. Protect watercourses subject to Accelerated Erosion by <br /> improving cross sections and/or providing Erosion-resistant <br /> lining. <br /> c. Exceptions - This rule shall not apply where it can be <br /> demonstrated that storm water discharge Velocities will not <br /> create an Erosion problem in the receiving watercourse. <br /> d. The following is a table for maximum permissible Velocity for <br /> Storm Water discharges: <br /> Maximum Permissible Velocities <br /> <br /> Feet/ Meters/ <br />Material Second Second <br /> <br />Fine sand (noncolloidal) <br />Sandy loam (noncolloidal) <br />Silt loam (noncolloidal) <br />Ordinary firm loam <br />Fine gravel <br />Stiff clay (very colloidal) <br /> <br />Material <br /> <br />2.5 0.8 <br />2.5 0.8 <br />3.0 0.9 <br />3.5 1.1 <br />5.0 1.5 <br />5.0 1.5 <br /> <br />Feet/ Meters/ <br />Second Second <br /> <br />Graded, loam to cobbles <br />(noncolloidal) <br />Graded, silt to cobbles <br />(colloidal) <br />Alluvial silts (noncolloidal) <br />Alluvial silts (colloidal) <br />Coarse gravel (noncolloidal) <br />Cobbles and shingles <br />Shales and hard pans <br /> <br />5.0 1.5 <br /> <br />5.5 1.7 <br /> <br />3.5 1.1 <br />5.0 1.5 <br />6.0 1.8 <br />5.5 1.7 <br />6.0 1.8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.