Laserfiche WebLink
577 <br /> <br /> Mr. J. A. Hough, District Engineer with the North Carolina Department of <br />Transportation, presented the following proposed 1998-99 Secondary Road <br />Construction Program for Cabarrus County. The Department of Transportation <br />published the notice of the presentation in THE INDEPENDENT TRIBUNE, and the <br />Clerk posted the proposed program on the Courthouse bulletin board. <br /> <br /> CABARRUS COUNTY <br />1998 Secondary, Trust, and Bond Construction Program <br /> <br />Unallocated Balance 97-98 Regular Funds <br />Unallocated Balance 97-98 Trust Funds <br />Unallocated Balance 97-98 Bond Funds <br />1998-99 Regular Secondary Construction Funds (Estimated) <br />1998-99 Secondary Trust Funds (Estimated) <br />1998-99 Secondary Bond Funds (Estimated) <br />Total Funds Available (Estimated) <br /> <br />-4,000.00 <br />90,000.00 <br />40,000.00 <br />432,565.00 <br />344,622.00 <br />205,495.00 <br />$1,108,682.00 <br /> <br />Reserve Approximately 10% for Overruns, Road <br /> Additions, Property Owner Participation Paving <br /> And Contingencies <br /> Surveys and Right of Way Acquisition <br />Reserve 20% of Regular and Trust Funds for Maintenance <br />Supplement W.O. 6.662417 - Volunteer Fire Dept. Maintenance <br />Total Deductions <br />FUNDS AVAILABLE FOR PROJECTS <br /> PROGRAM <br /> <br />110,245.00 <br /> <br />15,000.00 <br />155,437.00 <br />10,000.00 <br />$ 290,682.00 <br />$ 818,000.00 <br /> <br />MAP No. <br /> <br />4 <br /> <br />5 <br /> <br />6 <br /> <br />10 <br /> <br />11 <br /> <br /> DESCRIPTION <br />SR 2691 (Busbin Road) from SR 2444 to End <br />Maintenance. Paving Priority No. 4F Rural. <br />Grade, drain, base, pave and erosion control. <br />Length 0.67 Mi. <br />SR 1181 (Helmdale Road) from SR 1127 to SR 1125. <br />Paving Priority No. 5F Rural. Grade, drain, base, <br />pave and erosion control. Length 1.00 Mi. <br />SR 1929 (Isenhour Road) from SR 1625 to End <br />Maintenance. Paving Priority No. 6F Rural. <br />Grade, drain, base, pave and erosion control. <br />Length 0.58 Mi. <br />SR 1190 (Edgefield Road) from SR 1105 to End <br />Maintenance. Paving Priority No. 7F Rural. <br />Grade, drain, base, pave and erosion control. <br />Length 0.84 Mi. <br />SR 2601 (Bethel Church Road) from SR 2444 to <br />Cabarrus/Stanly Co. Line. Paving Priority No. 8F <br />Rural. Grade, drain, base, pave and erosion <br />control. Length 1.2 Mi. <br />This project is partially funded. Funds to complete <br />project will come from 1999-2000 funds unless <br />additional funds are received. <br />SR 2484 (Woodway Drive) from SR 2640 to End <br />Maintenance. Paving Priority No. 7F Subdivision. <br />Grade, drain, base, pave and erosion control. <br />Length 0.26 Mi. <br />SR 1253 (Wickersham Rd.) from SR 1252 to End <br />Maintenance. Paving Priorit~ No. 8F Subdivision. <br />Grade, drain, base, pave and erosion control. <br />Length 0.22 Mi. <br />SR 1275 (Spring Drive) from SR 1123 to End <br />Maintenance. Paving Priority No. 9F Subdivision. <br />Grade, drain, base, pave and erosion control. <br />Length 0.35 Mi. <br />SR 2285 (Pinebrook Trail) From SR 2000 to End <br />Maintenance. Paving Priority No. IOF Subdivision. <br />Grade, drain, base, pave and erosion control. <br />Length 0.23 Mi. <br />SR 2342 (Lilly Drive) from SR 1123 to End <br />Maintenance. Paving Priority No. 11 Subdivision. <br />Grade, drain, base, pave and erosion control. <br />Length 0.10 Mi. <br />SR 2359 (Sagebrush Circle) from SR 1148 to SR <br />SR 1148, SR 2360 (Walden Lane) from SR 2359 to <br />SR 2359, and SR 2361 (Forsythe Lane) from SR 2359 <br /> <br /> AMOUNT <br />$107,000.00 <br /> <br />143,000.00 <br /> <br />85,000.00 <br /> <br />130,000.00 <br /> <br />87,000.00 <br /> <br />29,000.00 <br /> <br />28,000.00 <br /> <br />43,000.00 <br /> <br />28,000.00 <br /> <br />11,000.00 <br /> <br />127,000.00 <br /> <br /> <br />