Laserfiche WebLink
489 <br /> <br />given by the Applicant to the Director, who shall cause a final inspection of <br />the water system to be made and shall within thirty (30) days accept the system <br />for the County, provided all stipulations of this contract have been met. <br /> 8. After completion of all construction, the Applicant shall furnish the <br />original drawings of all construction plans, revised to show any and all <br />revisions encountered during construction, to the County marked "As-Built". <br />The final plans shall show the actual condition in which the facility was <br />physically constructed and/or installed. Further, the final plans shall show <br />the correct location of the facility as it related to easements, right-of-way <br />lines, property lines, buildings, underground and/or overhead utility lines, <br />roadways, railroads, and all other physical features that would have any effect <br />or influence upon the constructed facility. The Professional Engineer employed <br />to design the facility shall be responsible for the accuracy and completeness <br />of the facility as shown on the final edition of the original construction <br />plans. These original drawings shall become the property of the County. <br /> 9. It is understood and agreed that when the described water system is <br />constructed according to the plans, specifications, and standards of the County, <br />said water system shall automatically become the property of the County without <br />cost to the County, and without further agreement in connection therewith. <br /> 10. The Applicant, having constructed the aforesaid water system at his <br />own proper cost and expense and outside the County's standard policy for water <br />extensions, agrees to waive all claims for compensation or monies refundable for <br />any capital facilities constructed. <br /> 11. Indemnification of the County. The Applicant will indemnify, hold <br />harmless and keep harmless, the County and its agents and employees from and <br />against all claims, damages, losses and expenses including attorney's fees - <br /> arising out of or resulting from the performance of the work, provided that any <br />such claim, damage, loss or expense is attributable to bodily injury, sickness, <br />disease or death, or to injury to or destruction of tangible property including <br />the loss of use resulting therefrom, and is caused in whole or in part by and <br />negligent or willful act or omission of the APPLICANT, LICENSED UTILITY <br />CONTRACTOR, any SUBCONTRACTOR(S) thereof or anyone directly or indirectly <br />employed by any of them or anyone whose acts any of them may be liable. <br /> In any and all claims against the County or any of its agents or <br />employees, by any employee of the APPLICANT, LICENSED UTILITY CONTRACTOR, and <br />SUBCONTRACTOR(S) thereof, anyone directly or indirectly employed by any of them, <br />or anyone for whose acts any of them may be liable, the indemnification <br />obligation shall not be limited in any way by any limitation on the amount or <br />type of damages, compensation or benefits payable by or for the APPLICANT, <br />LICENSED UTILITY CONTRACTOR, any SUBCONTRACTOR(S) thereof, under Workman's <br />Compensations Acts, Disability Benefit Acts or other employee benefits acts. <br /> Without limiting the foregoing, all of the provisions of Paragraph 11 <br />shall apply without limitation to any claim or action in the nature of trespass, <br />inverse condemnation, nuisance or similar claim or action for damage to real <br />and/or personal property. <br /> 12. The APPLICANT agrees to begin construction of the herein described <br />water main(s) within a period of 6 months and to complete construction, ready <br />for County acceptance, within 5 months following Commissioners approval of this <br />contract. If the construction of the water main(s) does not adhere to the above <br />time schedule, then the County may, upon a thirty (30) day written notice, <br />terminate the following Paragraphs of this contract: 1,2,3,6,7,8, and 9. The <br />remaining provisions of this contract shall remain in full force and effect. <br /> Upon termination of this contract under the provisions of this Paragraph, <br />the APPLICANT agrees to the following: <br /> 1. The ownership rights of any and all water pipe and related accessories <br /> installed under this contract will automatically be transferred to the <br /> County free and clear of all liens and claims. <br /> 2. Ail easements and/or rights-of-way directly related to this contract <br /> will be transferred to the County in a form satisfactory to the County <br /> within thirty (30) days after termination of this contract under the <br /> provisions of this Paragraph. <br /> 13. The APPLICANT agrees to provide to the County, one (1) meter per lot <br />of the development, of suitable size, meeting County standards. <br /> IN WITNESS WHEREOF, the parties hereto have caused this instrument to be <br />executed, the day and year first above written. <br /> <br />ATTEST: <br /> /s/ Phillip L. Kingsland <br /> WITNESS <br /> <br />BY: /s/ James R. Eudy <br />APPLICANT <br />CABARRUS COUNTY, NORTH CAROLINA <br /> <br /> <br />