Cabarrus County Commercial Building Plan Review Summary
<br />Begin Date: 111112017 through End Date: 1113012017
<br />BU2017-03341
<br />11/21/2017
<br />6361 GLEN AFTON BLVD
<br />Afton Ridge
<br />Existing shell building with new office.
<br />$0
<br />2,190
<br />CONCORD, NC 28027
<br />BU2017-03342
<br />11/21/2017
<br />140 UPPER CAPE ST
<br />TRIBUTE CONSTRUCTION INC
<br />Construct 24 unit apartment building. BUILDING 2
<br />$6,000,000
<br />0
<br />CONCORD, NC 28025
<br />BU2017-03343
<br />11/21/2017
<br />160 UPPER CAPE ST SW
<br />TRIBUTE CONSTRUCTION INC
<br />Construct 24 unit apartment building. BUILDING 3
<br />$6,000,000
<br />0
<br />CONCORD, NC 28027
<br />BU2017-03344
<br />11/21/2017
<br />3380 PLACID RD
<br />ICON MASONRY INC
<br />CASTLEBROOK REAR ENTRY SIGN
<br />$125,000
<br />0
<br />KANNAPOLIS, NC 28036
<br />BU2017-03346
<br />11/22/2017
<br />946 BURRAGE RD NE
<br />City of Concord Parks & Recreation Dept. Center
<br />5,214 sq. ft., 2 level building containing a workshop , exercise room, 2 arts
<br />$0
<br />5,214
<br />CONCORD, NC 28025
<br />and crafts rooms, cooking demonstration kitchen, and 3 offices.
<br />BU2017-03347
<br />11/22/2017
<br />8014 MYINT LN NW
<br />MYINT PH III
<br />4500 WOOD FRAMED SHELL BUILDING
<br />$0
<br />4,500
<br />CONCORD, NC 28027
<br />BU2017-03350
<br />11/22/2017
<br />489 N CANNON BLVD
<br />RCCC N Cannon Campus
<br />RCCC Cosmetology School and warehouse strg
<br />$0
<br />42,330
<br />KANNAPOLIS, NC 28083
<br />BU2017-03351
<br />11/22/2017
<br />2865 N CANNON BLVD
<br />EI, LLC
<br />Addition of new wall, cased opening , personnel door and 2 new sprinkler
<br />$0
<br />350
<br />KANNAPOLIS, NC 28083
<br />heads
<br />BU2017-03354
<br />11/27/2017
<br />8111 CONCORD MILLS BLVD
<br />Oshkosh B'gosh
<br />Removal of existing storefront, New storefront and entry portal with lighting,
<br />$0
<br />4,359
<br />CONCORD, NC 28027
<br />New sign at storefront, patch & repair of flooring.
<br />BU2017-03357
<br />11/27/2017
<br />8440 PIT STOP CT NW
<br />WHITE GENERAL CONTRACTOR
<br />STE 140- MOVE DOOR AND COUNTER OPEN
<br />$10,000
<br />0
<br />CONCORD, NC 28027
<br />BU2017-03358
<br />11/27/2017
<br />135 MANOR AVE SW
<br />OUR LADY OF GUADALUPE UPFIT
<br />Convert existing assembly room to add 2 classrooms in the back of that
<br />$0
<br />22,400
<br />CONCORD, NC 28025
<br />space. Continue existing hallway through to the back of the building. Upfit
<br />existing classroom into a small kitchen and dining area. Create 3 new
<br />meeting spaces, 2 bathrooms, a work shop, and a storage space in the
<br />rear of the building. Build room adjoining
<br />tenant spaces, a hallway for egress and a bathroom.
<br />BU2017-03359
<br />11/27/2017
<br />7650 GRIFFIN'S GATE DR SW
<br />CC Griffin Middle School Storage buildings
<br />(1) 18x21 and (1) 18x26 CC Griffin Middle School Storage buildings
<br />$75,000
<br />0
<br />CONCORD, NC 28025
<br />CABARRUS COUNTY
<br />BU2017-03362
<br />11/28/2017
<br />9965 POPLAR TENT RD
<br />Cannon Crossroad MOB Building 2
<br />Shell Office Building
<br />$0
<br />12,319
<br />CONCORD, NC 28027
<br />BU2017-03363
<br />11/28/2017
<br />9955 POPLAR TENT RD
<br />Cannon Crossroad MOB Building 1
<br />Shell Office Building
<br />$0
<br />12,319
<br />CONCORD, NC 28027
<br />BU2017-03369
<br />11/28/2017
<br />1480 CONCORD PKWY N
<br />JCPenney - Sephora Renovation
<br />Partial remodel of existing JCPenney store to provide for new Sephora
<br />$0
<br />19,909
<br />CONCORD, NC 28025
<br />Cosmetic Department of approx. 2,380 SF and the alteration of adjacent
<br />sales departments to allow for Sephora. Scope also includes: provide
<br />power as indicated and new LED wall -wash fixtures, replacement of carpet,
<br />paint, tile, base, ceiling tile, lights, diffuser relocation, and VAV box work.
<br />BU2017-03376
<br />11/29/2017
<br />14556 US HWY 601 S
<br />LIGHTHOUSE II UTILITY PIPE RACK
<br />CORNING LIGHTHOUSE II PROJECT PIPE RACK DRAWINGS
<br />$0
<br />0
<br />MIDLAND, NC 28107
<br />BU2017-03377
<br />11/29/2017
<br />1 BUFFALO AVE NW
<br />THOMPSON ROOFING SERVICES LLC
<br />COMMERCIAL ROOF REPAIR 1 PART 2
<br />$694,155
<br />0
<br />CONCORD, NC 28025
<br />BU2017-03399
<br />11/30/2017
<br />11701 PEACH ORCHARD RD
<br />Nicolette
<br />Verizon installing a 60kw diesel generator on new 5'x10' slab, no change to
<br />$0
<br />0
<br />CHARLOTTE, NC 28215
<br />tower or compound size
<br />P/anReviewSummary 1211120178:50:46AM
<br />1-2
<br />Page 318
<br />4 015
<br />
|