Laserfiche WebLink
MOSELEYARCHITECTS <br />11430 North Community House Rood, Gibson Building -Suite 225 <br />(704) 540-3755 FAX: (704) 5403754 <br />POTENTIAL CHANGE ORDER <br />6/6/2016 <br />Mr. David Pofahl <br />Edison Foard Construction Services Inc <br />3900 Rose Lake Dr. <br />Charlotte, NC 28217 <br />RE: Kannapolis New Middle School - 550128 <br />Potential Change Order No. 002 - DPI revisions <br />Please submit with the form below an itemized material cost and time proposal for the changes in the <br />contract sum and contract time for the following proposed modification(s) to the contract: <br />Description: <br />Reference the attached bulletin drawings and provide the revised work shown. <br />BDl-El, GFI outlet has been added <br />BDl-E2, GENU feeder wire has been revised <br />E6.1, Beakers have been revised <br />BD -P2, Acid waste pipe relocated for coordination of shower above. <br />BD -P3, Provide ES -1 in lieu of EW -1 in biotech D106 <br />BD -P4. BD -P5. BD -P6 & BD -P7. Science classroom water distribution clarification <br />Receipt of your proposal is requested by: 6/2012016 <br />This is not a change order nor a directive to proceed with the work described herein until accepted by the Owner <br />Proposal <br />In response to the request above, the Contractor proposes to perform the changes described for an <br />increase / decrease in the contract sum in the amount of $ and increase / <br />decrease in the contract time of calendar days. <br />A detailed breakdown of labor and material costs is attached hereto which includes all costs and time <br />associated with the proposed change(s). <br />Signed: Date: <br />.r' <br />Steve Nally, Construction Administrator <br />Encl.: As Stated <br />Cc w/encl.: <br />Attachment number 2 \n <br />F-7 Page 106 <br />