Laserfiche WebLink
I 000 5C 000 00 5B <br />SC ASPHALT SURFACE COURSE (S9.59( <br />IC INTERMEDIATE COURSE (119.08( <br />BC AGGREGATE BASE COURSE <br />56 COMPACTED SUBBASE <br />NOTES: <br />1. CONFIRM WITH GEOTECHNICAL ENGINEER FOR PAVEMENT SECTIONS AND SUBGRADE. NOTIFY <br />ENGINEER IN CASE OF CONFLICT. <br />2. PROVIDE CONSTRUCTION JOINTS PER ACI AND/OR GEOTECHNICAL ENGINEER RECOMMENDATIONS <br />(CONCRETE PAVEMENT ONLY(. <br />PAVEMENT HATCH LEGEND <br />LIGHT DUTY ASPHALT <br />HEAW DUTY ASPHALT <br />PARKING REQUIREMENTS <br />VEHICLE PARKING <br />CONCRETE PAVEMENT <br />F, I <br />BUILDING SIZE: <br />±283,500-SF(OFFICE) <br />PARKING REQUIREMENT: <br />1 SPACE PER 400 -SF GFA OF SALES/OFFICE AREA PLUS 1 SPACES PER <br />COMPANY VEHICLE AT PEAK SHIFT <br />REQUIRED PARKING: <br />ASSUME I5%SALES/OFFICE AREA PER BUILDING = 42,525 -SF <br />42,525/400 = 107 SPACES PLUS 12 COMPANY VEHICLES <br />• <br />M <br />119 TOTAL SPACES ARE REQUIRED <br />PROVIDED PARKING: <br />269 SPACES (INCLUDING 12 ACCESSIBLE SPACES( <br />DRAWING INFORMATION <br />4 <br />40 0 40 80 <br />SCALE: 1" = 40' <br />mjL5 <br />M <br />O <br />0 <br />O <br />wmm <br />(z W <br />o <br />• <br />M <br />W <br />ZOV <br />W°= <br />V <br />O <br />� <br />6 <br />