Laserfiche WebLink
Exhibit G <br /> <br /> <br /> <br /> <br />MEETING MINUTES <br /> <br />DATE: November 9, 2021 <br />TIME: 5:30 p.m. 6:00 p.m. <br />LOCATION: MS Teams <br />PURPOSE: Neighborhood Meeting to discuss Aqua Fieldstone Well #1 Project <br />In Attendance <br /> <br />NAME ORGANIZATION PHONE EMAIL <br />Brian LaFranchi Dewberry 704.631.5206 blafranchi@dewberry.com <br /> <br />Michael Melton Aqua North Carolina 704.704.3315 MAMelton@aquaamerica.com <br /> <br />Cheryl Cannon 5313 Historic Springs Drive 704.791.5133 ccannongirl@icloud.com <br /> <br />Christy Baggarly 5301 Historic Springs Drive cmbaggarly@gmail.com <br /> <br />Brenda Long 5339 Historic Springs Drive <br />Summary of Discussion <br />1. Q: Ms. Baggerly - What is driving the purpose of the project? A: Mr. Melton There are <br />over 100 chemicals tested for. We saw elevated sets of results for radionuclides. The well <br />is currently offline. In an abundance of caution we are getting ahead of State intervention <br />and adding additional treatment. Going to tear down existing building and build a new <br />building large enough to house the new filtration system. <br />2. Q: Ms. Cannon What is the timeframe? A: Mr. Melton - We were hoping to finish by the <br />end of the year. We have Kevin Tyndall Builders contracted to do the construction. End of <br />first quarter, 2022 is likely, given the permitting, which is out of our hands. <br />3. Q: Ms. Long Can you talk about what is happening with the well off of Byfield drive? A: <br />Mr. Melton showed a map and clarified that we were talking about well #1 off of Byfield <br />drive. Mr. LaFranchi indicated that the confusion is probably stemming from the fact that <br />the address for the parcel is off of Historic Springs Drive. <br />4. Ms. Cannon u kept us informed, we live directly across from the building and <br />are glad that you are replacing the existing building and keeping the existing tree line. <br />5. Q: Ms. Cannon will you keep the existing driveway gravel? A: Mr. Melton Yes, we <br />typically do. Concrete is expensive. As part of the project we will fix the driveway \[top <br />dress\] and prevent it from washing out. Ms. Cannon In rainy weather, Ive seen some <br />trucks having difficulty getting back up the drive, but I feel comfortable that you will take <br />care of it to fit your needs. <br />Action Items <br />ACTION ITEM ASSIGNED TO DATE DUE STATUS <br /> <br />12 <br /> <br />