My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Approved December 14, 2021 PZ Minutes
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
Planning
>
2020
>
Approved December 14, 2021 PZ Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 1:27:20 PM
Creation date
1/14/2022 1:27:13 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
12/14/2021
Board
Parks
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Order to Take Corrective Action: If, upon a hearing held pursuant to the notice prescribed above, the <br />Floodplain Administrator shall find that the building or development is in violation of the Flood Damage <br />Prevention Ordinance, he or she shall issue an order in writing to the owner, requiring the owner to remedy <br />the violation within a specified time period, not less than sixty (60) calendar days, nor more than ninety (90) <br />calendar days. Where the Floodplain Administrator finds that there is imminent danger to life or other <br />property, he or she may order that corrective action be taken in such lesser period as may be feasible. <br /> <br />(4) Appeal: Any owner who has received an order to take corrective action may appeal the order to the Board of <br />Adjustment by giving notice of appeal in writing to the Floodplain Administrator and the Planning and Zoning <br />Commission Clerk within ten (10) days following issuance of the final order. In the absence of an appeal, the <br />order of the Floodplain Administrator shall be final. The Board of Adjustment shall hear an appeal within a <br />reasonable time and may affirm, modify and affirm, or revoke the order. <br /> <br />(5) Failure to Comply with Order: If the owner of a building or property fails to comply with an order to take <br />corrective action for which no appeal has been made or fails to comply with an order of the Board of <br />Adjustment following an appeal, the owner shall be guilty of a Class 1 misdemeanor pursuant to NC G.S. § <br />143-215.58 and shall be punished at the discretion of the court. <br /> <br />SECTION E. VARIANCE PROCEDURES <br />(1) The Board of Adjustment as established by Cabarrus County, hereinafter referred to as the “appeal board,” <br />shall hear and decide requests for variances from the requirements of this ordinance. <br /> <br />(2) Any person aggrieved by the decision of the appeal board may appeal such decision to the Court, as provided <br />in Chapter 7A of the North Carolina General Statutes. <br /> <br />(3) Variances may be issued for: <br /> <br />(a) The repair or rehabilitation of historic structures upon the determination that the proposed repair or <br />rehabilitation will not preclude the structure's continued designation as a historic structure and that <br />the variance is the minimum necessary to preserve the historic character and design of the structure; <br /> <br />(b) Functionally dependent facilities if determined to meet the definition as stated in Part 2 of this <br />ordinance, provided provisions of Part 4, Section E(9)(b), (c), and (e) have been satisfied, and such <br />facilities are protected by methods that minimize flood damages during the base flood and create no <br />additional threats to public safety; or <br /> <br />(c) Any other type of development provided it meets the requirements of this Section. <br /> <br />(4) In passing upon variances, the appeal board shall consider all technical evaluations, all relevant factors, all <br />standards specified in other sections of this ordinance, and: <br /> <br />(a) The danger that materials may be swept onto other lands to the injury of others; <br /> <br />(b) The danger to life and property due to flooding or erosion damage; <br /> <br />(c) The susceptibility of the proposed facility and its contents to flood damage and the effect of such <br />damage on the individual owner; <br /> <br />(d) The importance of the services provided by the proposed facility to the community; <br /> <br />(e) The necessity to the facility of a waterfront location as defined under Part 2 of this ordinance as a <br />functionally dependent facility, where applicable; <br /> <br />Page 17 of 28 <br />2021 NC Model Ordinance, Non-Coastal Amended <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.