My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
October 11, 2022 Proposed Agenda
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
Planning
>
2020
>
October 11, 2022 Proposed Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2022 11:00:38 AM
Creation date
10/4/2022 11:00:07 AM
Metadata
Fields
Template:
Planning Minutes
Planning Minutes - Date
10/11/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tubgg!Vtf!Pomz; <br />QMBOOJOH!TUBGG!SFQPSU!!!!!!Bqqspwfe;!```` <br />DBCBSSVT!DPVOUZ!QMBOOJOH!BOE!\[POJOH!DPNNJTTJPOEfojfe;!````! <br />!!!!!!!!!!Ubcmfe!!```` <br />Assure the adequacy of: <br />p Wastewater disposal <br />p Solid waste management <br />p On site drinking water and wastewater disposal <br />p Governmental water and sewer (if applicable) <br />p Police, Fire and Emergency Medical Services protection <br />p School adequacy (if applicable) <br />p Transportation systems (in and around the site) and <br />p Other public facilities <br />Comply with the general plans for the physical development of the County as embodied in these <br />regulations <br />Section 8-4. 13 Sanitary Landfill <br />Agricultural/Open, Limited Industrial and General Industrial districts <br />The following additional items shall be included on the site plan: <br />a.Extent of area to be filled. <br />b.Location, width and elevation of all easements and rights-of-way within or adjacent to <br />extraction site. <br />c.Location of all existing or proposed structures on site. <br />d.Location of all areas on the site subject to flood hazard or inundation. <br />e.Location of all water courses on the site, including direction of flow and normal fluctuation <br />of flow. <br />f.Existing topography at a contour interval of two feet, based on mean sea level datum. <br />g.Typical cross sections showing extent of overburden, extent of fill and water table <br />elevation, based on mean sea level datum. <br />h.Proposed handling and storage areas for overburden, by-products and fill materials. <br />i.Proposed fencing, screening and gates, parking, service and other areas. <br />j.Any areas proposed for ponding. <br />k.Access roads to the site, as well as on-site roads, with indication of surface treatment to <br />limit dust. Site distances on all roads used for access to the site. <br /> <br />An Operations Plan shall be submitted including: <br />p The date of commencement of operations and their expected duration <br />p Proposed hours and days of operation <br />p Complete description of operation, including source of materials, method of <br />compaction, type of sealing proposed, types and number of equipment to be used <br />p Any phasing of operations and relationship among phases <br /> <br />A Rehabilitation Plan shall be submitted which shall include: <br />p A statement of planned future use of the site, including detailed methods of <br />accomplishment <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.