My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Proposed October 11 2022 Minutes
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
Planning
>
2020
>
Proposed October 11 2022 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:23:53 PM
Creation date
12/2/2022 9:36:58 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/11/2022
Board
Parks
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff Use Only: <br />PLANNING STAFF REPORT Approved: ____ <br />CABARRUS COUNTY PLANNING AND ZONING COMMISSION Denied: ____ <br /> Tabled ____ <br /> Assure the adequacy of: <br />o Wastewater disposal <br />o Solid waste management <br />o On site drinking water and wastewater disposal <br />o Governmental water and sewer (if applicable) <br />o Police, Fire and Emergency Medical Services protection <br />o School adequacy (if applicable) <br />o Transportation systems (in and around the site) and <br />o Other public facilities <br /> Comply with the general plans for the physical development of the County as embodied in these <br />regulations <br />Section 8-4. 13 Sanitary Landfill <br />Agricultural/Open, Limited Industrial and General Industrial districts <br />The following additional items shall be included on the site plan: <br />a. Extent of area to be filled. <br />b.Location, width and elevation of all easements and rights-of-way within or adjacent to <br />extraction site. <br />c. Location of all existing or proposed structures on site. <br />d. Location of all areas on the site subject to flood hazard or inundation. <br />e. Location of all water courses on the site, including direction of flow and normal fluctuation <br />of flow. <br />f. Existing topography at a contour interval of two feet, based on mean sea level datum. <br />g. Typical cross sections showing extent of overburden, extent of fill and water table <br />elevation, based on mean sea level datum. <br />h. Proposed handling and storage areas for overburden, by-products and fill materials. <br />i. Proposed fencing, screening and gates, parking, service and other areas. <br />j. Any areas proposed for ponding. <br />k. Access roads to the site, as well as on-site roads, with indication of surface treatment to <br />limit dust. Site distances on all roads used for access to the site. <br /> <br />An Operations Plan shall be submitted including: <br />o The date of commencement of operations and their expected duration <br />o Proposed hours and days of operation <br />o Complete description of operation, including source of materials, method of <br />compaction, type of sealing proposed, types and number of equipment to be used <br />o Any phasing of operations and relationship among phases <br /> <br />A Rehabilitation Plan shall be submitted which shall include: <br />o A statement of planned future use of the site, including detailed methods of <br />accomplishment <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.