|
Cabarrus County Commercial Building Plan Review Summary
<br />Green File Date Address
<br />Begin Date: 121112024 through End Date: 1213112024
<br />Application Name
<br />Description
<br />Est Cost Est Sq Ft
<br />BU2024-04062
<br />12/2/2024
<br />225 CLIFFWOOD ST NW A
<br />TRUE HOMES LLC CONDOMINIUMS 225 UNIT A
<br />$63,737
<br />1,362
<br />CONCORD, NC 28027
<br />TRUE HOMES LLC CONDOMINIUMS 225 B
<br />BU2024-04063
<br />12/2/2024
<br />225 CLIFFWOOD ST NW A
<br />$66,319
<br />66,319
<br />12/2/2024
<br />CONCORD, NC 28027
<br />225 CLIFFWOOD ST NW A
<br />TRUE HOMES LLC CONDOMINIUMS 225 C
<br />BU2024-04064
<br />$63,737
<br />1,362
<br />CONCORD, NC 28027
<br />TRUE HOMES LLC CONDOMINIUMS 225 D
<br />BU2024-04065
<br />12/2/2024
<br />225 CLIFFWOOD ST NW A
<br />$66,319
<br />1,407
<br />CONCORD, NC 28027
<br />TRUE HOMES LLC CONDOMINIUMS 225 E
<br />BU2024-04066
<br />12/2/2024
<br />225 CLIFFWOOD ST NW A
<br />$63,737
<br />63,737
<br />CONCORD, NC 28027
<br />9620 CHRISTENBURY PKWY
<br />McCorkle Sign Company To install 2 wall sign and connect to existing power pulled by others.
<br />BU2024-04067
<br />12/2/2024
<br />$9,000
<br />30
<br />CONCORD, NC 28027
<br />BU2024-04072
<br />12/2/2024
<br />840 CONCORD PKWY N
<br />LJ 4 DEVELOPMENT LLC - Canopy Extension
<br />The Extension area will be 40' W x 30' L using the 16" W x 24 Gauge
<br />$37,800
<br />37,800
<br />CONCORD, NC 28027
<br />Standing Seam Galvanized Metal painted panels. In addition, we will be
<br />fabricating a metal frame consisting of WF Beams 12" x 4" spaced with Red
<br />Oxide Purlins, then covered by the roof panels and 6" x
<br />1/4" Steel uprights to support the entire structure.
<br />12/2/2024
<br />$4,000
<br />0
<br />BU2024-04073
<br />9001 QUAY RD
<br />C HERMAN CONSTRUCTION LLC
<br />Construction Trailer
<br />CONCORD, NC 28262
<br />BU2024-04082
<br />12/3/2024
<br />2420 HEDGECLIFF RD
<br />PRESTIGE BUILDING COMPANY INC - HEDGECLIFF
<br />HEDGECLIFF TOWNHOMES MAIL KIOSK -- 40ftx12ft Shingled Roof
<br />$15,000
<br />456
<br />CONCORD, NC 28025
<br />210 TALA DR SW
<br />TOWNHOMES MAIL KIOSK
<br />FEAZEL ROOFING, LLC
<br />Shelter
<br />Tower Place BLDG 2 Remove and replace asphalt shingle roof . Install new
<br />BU2024-04086
<br />12/3/2024
<br />$281,247
<br />12,319
<br />CONCORD, NC 28027
<br />felt, ice & water shield and new asphalt shingles for Entire Building
<br />210, 211, 212, 213, 214, 215, 216,217, 220, 221, 222, 223, 224, 225, 226,
<br />227, 230, 231, 232, 233 Tala Drive SW
<br />reroofing project 2251-2263 SPIDER DRIVE - existing roof system and
<br />$42,000
<br />5,500
<br />BU2024-04087
<br />12/3/2024
<br />2251 SPIDER DR NE
<br />JOHNSON'S ROOFING SERVICE
<br />KANNAPOLIS, NC 28083
<br />sheet metal flashing will be removed. a new tpo roof system will be
<br />310 TALA DR SW
<br />FEAZEL ROOFING, LLC
<br />installed.
<br />BU2024-04088
<br />12/3/2024
<br />Tower Place BLDG 3 Remove and replace asphalt shingle roof . Install new
<br />$281,247
<br />9,702
<br />CONCORD, NC 28027
<br />felt, ice & water shield and new asphalt shingles for Entire Building
<br />310, 311, 312, 313, 314, 315, 320, 321, 322, 323, 324, 325, 330, 331, 332,
<br />333 Tala Drive SW.
<br />BU2024-04089
<br />12/3/2024
<br />6007 VICTORY LN SW
<br />KINGDOM DEMOLITION, LLC
<br />SELECTIVE INTERIOR DEMO OF PARTITION WALLS AND FINISHES
<br />$98,000
<br />20,269
<br />CONCORD, NC 28027
<br />BU2024-04090
<br />12/3/2024
<br />510 HANIA DR SW
<br />FEAZEL ROOFING, LLC
<br />Tower Place BLDG 5 Remove and replace asphalt shingle roof. Install new
<br />$281,247
<br />97
<br />CONCORD, NC 28027
<br />felt, ice & water shield and new asphalt shingles for Entire Building
<br />510, 511, 512, 512, 514, 515, 520, 521, 522, 523, 524, 525, 530, 531, 532,
<br />533 Hania Drive
<br />BU2024-04092
<br />12/3/2024
<br />980 DERITA RD, SUITE# D1
<br />GRAPEVINE DISTRIBUTORS OF NORTH CAROLINA
<br />PERMIT INSPECTION
<br />CONCORD, NC 28027
<br />INC
<br />JABC
<br />PlanReviewSummary 1/9/2025 6:59:39 PM 1 of 6
<br />Page 304
<br />
|