577
<br />
<br /> Mr. J. A. Hough, District Engineer with the North Carolina Department of
<br />Transportation, presented the following proposed 1998-99 Secondary Road
<br />Construction Program for Cabarrus County. The Department of Transportation
<br />published the notice of the presentation in THE INDEPENDENT TRIBUNE, and the
<br />Clerk posted the proposed program on the Courthouse bulletin board.
<br />
<br /> CABARRUS COUNTY
<br />1998 Secondary, Trust, and Bond Construction Program
<br />
<br />Unallocated Balance 97-98 Regular Funds
<br />Unallocated Balance 97-98 Trust Funds
<br />Unallocated Balance 97-98 Bond Funds
<br />1998-99 Regular Secondary Construction Funds (Estimated)
<br />1998-99 Secondary Trust Funds (Estimated)
<br />1998-99 Secondary Bond Funds (Estimated)
<br />Total Funds Available (Estimated)
<br />
<br />-4,000.00
<br />90,000.00
<br />40,000.00
<br />432,565.00
<br />344,622.00
<br />205,495.00
<br />$1,108,682.00
<br />
<br />Reserve Approximately 10% for Overruns, Road
<br /> Additions, Property Owner Participation Paving
<br /> And Contingencies
<br /> Surveys and Right of Way Acquisition
<br />Reserve 20% of Regular and Trust Funds for Maintenance
<br />Supplement W.O. 6.662417 - Volunteer Fire Dept. Maintenance
<br />Total Deductions
<br />FUNDS AVAILABLE FOR PROJECTS
<br /> PROGRAM
<br />
<br />110,245.00
<br />
<br />15,000.00
<br />155,437.00
<br />10,000.00
<br />$ 290,682.00
<br />$ 818,000.00
<br />
<br />MAP No.
<br />
<br />4
<br />
<br />5
<br />
<br />6
<br />
<br />10
<br />
<br />11
<br />
<br /> DESCRIPTION
<br />SR 2691 (Busbin Road) from SR 2444 to End
<br />Maintenance. Paving Priority No. 4F Rural.
<br />Grade, drain, base, pave and erosion control.
<br />Length 0.67 Mi.
<br />SR 1181 (Helmdale Road) from SR 1127 to SR 1125.
<br />Paving Priority No. 5F Rural. Grade, drain, base,
<br />pave and erosion control. Length 1.00 Mi.
<br />SR 1929 (Isenhour Road) from SR 1625 to End
<br />Maintenance. Paving Priority No. 6F Rural.
<br />Grade, drain, base, pave and erosion control.
<br />Length 0.58 Mi.
<br />SR 1190 (Edgefield Road) from SR 1105 to End
<br />Maintenance. Paving Priority No. 7F Rural.
<br />Grade, drain, base, pave and erosion control.
<br />Length 0.84 Mi.
<br />SR 2601 (Bethel Church Road) from SR 2444 to
<br />Cabarrus/Stanly Co. Line. Paving Priority No. 8F
<br />Rural. Grade, drain, base, pave and erosion
<br />control. Length 1.2 Mi.
<br />This project is partially funded. Funds to complete
<br />project will come from 1999-2000 funds unless
<br />additional funds are received.
<br />SR 2484 (Woodway Drive) from SR 2640 to End
<br />Maintenance. Paving Priority No. 7F Subdivision.
<br />Grade, drain, base, pave and erosion control.
<br />Length 0.26 Mi.
<br />SR 1253 (Wickersham Rd.) from SR 1252 to End
<br />Maintenance. Paving Priorit~ No. 8F Subdivision.
<br />Grade, drain, base, pave and erosion control.
<br />Length 0.22 Mi.
<br />SR 1275 (Spring Drive) from SR 1123 to End
<br />Maintenance. Paving Priority No. 9F Subdivision.
<br />Grade, drain, base, pave and erosion control.
<br />Length 0.35 Mi.
<br />SR 2285 (Pinebrook Trail) From SR 2000 to End
<br />Maintenance. Paving Priority No. IOF Subdivision.
<br />Grade, drain, base, pave and erosion control.
<br />Length 0.23 Mi.
<br />SR 2342 (Lilly Drive) from SR 1123 to End
<br />Maintenance. Paving Priority No. 11 Subdivision.
<br />Grade, drain, base, pave and erosion control.
<br />Length 0.10 Mi.
<br />SR 2359 (Sagebrush Circle) from SR 1148 to SR
<br />SR 1148, SR 2360 (Walden Lane) from SR 2359 to
<br />SR 2359, and SR 2361 (Forsythe Lane) from SR 2359
<br />
<br /> AMOUNT
<br />$107,000.00
<br />
<br />143,000.00
<br />
<br />85,000.00
<br />
<br />130,000.00
<br />
<br />87,000.00
<br />
<br />29,000.00
<br />
<br />28,000.00
<br />
<br />43,000.00
<br />
<br />28,000.00
<br />
<br />11,000.00
<br />
<br />127,000.00
<br />
<br />
<br />
|