October 10, 2013 (Board Retreat)
<br />Page 1774
<br />Pitts School Rd Elem
<br />Paint hallways, classrooms, doors and door frames
<br />35,000
<br />Pitts School Rd Elem
<br />Replace water heater
<br />14,000
<br />Pitts School Rd Elem
<br />Pave access road behind school and add parking spaces
<br />125,000
<br />Pitts School Rd Elem
<br />Construct storage building
<br />60,500
<br />• Brown McAllister Elem
<br />Pave walkway between two playgrounds
<br />35,000
<br />• Brown McAllister Elem
<br />Extend sidewalk to mobile units behind school
<br />12,000
<br />• Brown McAllister Elem
<br />Paint hallways, classrooms, doors and door frames
<br />15,000
<br />• Brown McAllister Elem
<br />Install canopy to mobile units
<br />33,000
<br />• Brown McAllister Elem
<br />Paint - exterior (especially on front wall)
<br />75,000
<br />• Brown McAllister Elem
<br />Replace front corridor tile
<br />100,000
<br />• Brown McAllister Elem
<br />Renovate admin offices and kitchen
<br />175,000
<br />Rocky River Elem
<br />Install additional exterior lighting especially in
<br />arking lot in front of cafeteria
<br />17,000
<br />Rocky River Elem
<br />Install separate HVAC for the kitchen
<br />112,000
<br />Rocky River Elem
<br />Freestanding bookcases for use in classroom
<br />50,000
<br />Rocky River Elem
<br />Install canopy for car riders
<br />82,500
<br />Rocky River Elem
<br />Replace carpet in classrooms
<br />100,000
<br />Rocky River Elem
<br />Replace the existing PVI water heater.
<br />33,000
<br />Rocky River Elem
<br />Replace carpet in hallways
<br />85,000
<br />Rocky River Elem
<br />Seal and stripe parking lots and drives
<br />95,000
<br />Royal Oaks Elem
<br />Replace windows
<br />126,000
<br />Royal Oaks Elem
<br />Replace mobile restroom
<br />28,000
<br />Royal Oaks Elem
<br />Install more asphalt as the topping coat
<br />40,000
<br />Royal Oaks Elem
<br />Replace VCT in hallway (including asbestos abatement)
<br />60,000
<br />Royal Oaks Elem
<br />Install asphalt at the area around Head Start
<br />75,000
<br />• M Irvin Elem
<br />Remedy erosion issues on back playground
<br />10,000
<br />• M Irvin Elem
<br />Redirect spring that is leaking across parking lot
<br />25,000
<br />• M Irvin Elem
<br />Replace carpet with VCT in hallways
<br />100,000
<br />• M Irvin Elem
<br />Install cameras
<br />38,500
<br />• M Irvin Elem
<br />Replacement of water heater
<br />14,000
<br />• M Irvin Elem
<br />Paint hallways, classrooms, doors and door frames
<br />50,000
<br />• M Irvin Elem
<br />Construct storage building
<br />55,000
<br />• R Odell Elem
<br />Install canopy to mobile units
<br />22,500
<br />• R Odell Elem
<br />Construct picnic shelter
<br />26,500
<br />• R Odell Elem
<br />Paint hallways, classrooms, doors and door frames
<br />35,000
<br />• R Odell Elem
<br />Replace water heater in 5 years
<br />14,000.
<br />Weddington Elem
<br />Restripe bus lot and visitor lot
<br />15,000i
<br />Weddington Elem
<br />Install canopy for ADA accessibility
<br />50,000
<br />Weddington Elem
<br />Upgrade cameras
<br />38,500
<br />Weddington Elem
<br />Replace broken blinds in various classrooms
<br />20,000
<br />Weddington Elem
<br />Repair warped cabinets throughout classrooms
<br />50,000
<br />Weddington Elem
<br />Add tack strips throughout hallways.
<br />7,5001
<br />Weddington Elem
<br />Paint - interior (hallways and classrooms) and exterior
<br />35,000
<br />Weddington Elem
<br />Replace carpet in classrooms and hallways
<br />120,000
<br />Weddington Elem
<br />Relocate rock storage building
<br />3,000
<br />Weddington Elem
<br />Replace water heater in 5 years
<br />14,000
<br />Winecoff Elem
<br />Covered walkway for students at bus circle
<br />100,000
<br />Winecoff Elem
<br />Covered walkway for students at car rider circle
<br />120,000
<br />Winecoff Elem,
<br />Replace fire alarm system
<br />67, 2004
<br />Winecoff Elem
<br />Seal and restripe parking lots and drives
<br />95,000
<br />Winecoff Elem
<br />Replace water heater in 5 years
<br />14,000
<br />Winecoff Elem
<br />Replace gym floor
<br />165,000
<br />Wolf Meadow Elem
<br />Install 2nd basketball hoop (maybe more) and padding on
<br />walls in gym
<br />20,000
<br />Wolf Meadow Elem
<br />Replace ramps to dumpsters and mobiles
<br />25,000
<br />Wolf Meadow Elem
<br />Install RPZ backflow preventer on main water line
<br />44,000
<br />Wolf Meadow Elem
<br />replace broken and stained ceiling tiles
<br />50,000
<br />Wolf Meadow Elem
<br />finish half wall of room 126
<br />15,000
<br />Wolf Meadow Elem
<br />Replace mobile unit doors and ramps and decks
<br />32,000
<br />Wolf Meadow Elem
<br />Repave parent drive and main drive
<br />160,000
<br />Wolf Meadow Elem
<br />Upgrade door hardware to ADA standards, replace doors &
<br />add sweeps
<br />200,000 .
<br />Wolf Meadow Elem
<br />paint gym
<br />6,000
<br />Wolf Meadow Elem
<br />repaint group bathrooms where paint is peeling
<br />10,000
<br />Wolf Meadow Elem
<br />Paint hallways, classrooms, door and door frames
<br />35,000
<br />Wolf Meadow Elem
<br />install doors in classrooms to close off the offices in
<br />between classrooms
<br />45,000
<br />Wolf Meadow Elem
<br />Replace carpet in classrooms
<br />50.000
<br />Wolf Meadow Elem
<br />Enclose Media Center with permanent walls and update
<br />lighting
<br />70,000
<br />Wolf Meadow Elem
<br />Install new boiler
<br />75,000
<br />Wolf Meadow Elem
<br />Replace exterior classroom doors
<br />110,000
<br />Wolf Meadow Elem
<br />replace classroom cabinetry
<br />200,000
<br />Wolf Meadow Elem
<br />Upgrade cameras
<br />38,500
<br />Wolf Meadow Elem
<br />Construct group rest room on cafeteria side
<br />125,000
<br />Total
<br />$15,353,900