October 10, 2013 (Board Retreat)
<br />Page 1773
<br />Harrisburg Elem
<br />Install kitchen A/C unit
<br />112,000
<br />Harrisburg Elem
<br />Paint inside and out
<br />35,000
<br />Harrisburg Elem
<br />Replace carpet in hallways
<br />100,000
<br />Harrisburg Elem
<br />Install canopy for bus riders (extension)
<br />77,000
<br />Hickory Ridge High
<br />Install Corridor doors for exiting from cafeteria
<br />15,000
<br />Hickory Ridge High
<br />Repairs for bleachers in Gymnasium
<br />15,000
<br />Hickory Ridge High
<br />Install additional cameras
<br />22,400
<br />Hickory Ridge High
<br />Construct Storage Building
<br />80,000
<br />Hickory Ridge High
<br />Restripe parking lots and roads
<br />80,000
<br />Hickory Ridge High
<br />Install sound system in cafeteria
<br />15,000
<br />Hickory Ridge Middle
<br />Widen bus lot sidewalk
<br />20,000
<br />J N Fries Middle
<br />Reconfigure our front entrance for visitors to pass
<br />through the front office
<br />150
<br />J N Fries Middle
<br />Replace /repair bathroom stall partitions in boys locker
<br />room per health inspector
<br />20,000
<br />J N Fries Middle
<br />Upgrade plumbing fixtures throughout school
<br />50,000
<br />J N Fries Middle
<br />Install canopy for bus riders
<br />55,000
<br />J N Fries Middle
<br />Upgrade lighting and controls
<br />56,000
<br />J N Fries Middle
<br />Paint hallways, classrooms, doors and door frames
<br />50,000
<br />J N Fries Middle
<br />lInstall VCT in front lobby
<br />60,000
<br />Jay M Robinson High
<br />Replace ceiling tiles in Cafeteria and Kitchen
<br />20,000
<br />Jay M Robinson High
<br />Gym and Cafeteria Painted
<br />85,000
<br />Jay M Robinson High
<br />Repair auditorium seating
<br />60,000
<br />Jay M Robinson High
<br />Outfit cafeteria with new tables and chair combos
<br />80,000
<br />Jay M Robinson High
<br />Construct storage building
<br />99,000
<br />Long School
<br />Upgrade electrical service in the building
<br />154,000
<br />Mary Frances Wall
<br />Add 6 rest rooms in South Wing Pod
<br />30,000
<br />Mary Frances Wall
<br />Replace water supply piping and other piping
<br />35,000
<br />Mary Frances Wall
<br />Remove carpet and replace with VCT in South Wing Pod
<br />60,000
<br />Mary Frances Wall
<br />Repair Roof /Install gutters & roof leaders at Building
<br />No. 400
<br />15,000
<br />Mary Frances Wall
<br />Paint hallways, classrooms, doors and door frames
<br />12,000
<br />Mt Pleasant Elem
<br />Replace gym floor tile - may contain asbestos tile or
<br />adhesive (confirm)
<br />75,000
<br />Mt Pleasant Elem
<br />Paint - Media Center and classrooms
<br />35,000
<br />Mt Pleasant Elem
<br />Enclose Media Center with permanent walls
<br />70,000
<br />Mt Pleasant Elem
<br />Replacement of water heater
<br />14,000
<br />Mt Pleasant Elem
<br />Replace carpet in classrooms and office
<br />42,000
<br />Mt Pleasant High
<br />Replace bathroom stall partitions (10 common area
<br />bathrooms)
<br />75,000
<br />Mt Pleasant High
<br />replace carpet in theater
<br />75,000
<br />Mt Pleasant High
<br />Install concrete floor for storage building
<br />10,000
<br />Mt Pleasant High
<br />Replace carpet in media center
<br />75,000
<br />Mt Pleasant High
<br />Rework field drainage
<br />45,000
<br />Mt Pleasant High
<br />Replace ceiling tiles, fix hole in wall near ice machine,
<br />replace freezer floor, paint kitchen
<br />15,000
<br />IMt Pleasant High
<br />Install HVAC in Auto Shop area
<br />20,000
<br />IMt Pleasant High
<br />Replace water heater
<br />14,000
<br />Mt Pleasant High
<br />Construct a storage building for Band and Theater Props
<br />and Equipment
<br />85,000
<br />Mt Pleasant High
<br />Replace rubberized track
<br />150,000
<br />Mt Pleasant Middle
<br />Replace backflow valve
<br />35,000
<br />Mt Pleasant Middle
<br />Replace fire alarm system
<br />66,000
<br />Mt Pleasant Middle
<br />Install ceiling and new lighting in cafeteria
<br />30,000
<br />�t Pleasant middle
<br />Repair roof - media center
<br />50,000
<br />jMt Pleasant Middle
<br />j
<br />Replace roofs on field house metal storage building and
<br />concession stand
<br />82,500
<br />Mt Pleasant Middle
<br />repairs to field house (roof and foundation)
<br />100,000
<br />Mt Pleasant Middle
<br />Upgrade auxiliary gym: HVAC, electrical and painting
<br />145,600
<br />Mt Pleasant Middle
<br />replace carpet in entire office area
<br />20,000
<br />p mt Pleasant Middle
<br />Replace carpet - 8th grade hallways
<br />50,000
<br />(Northwest Cabarrus High
<br />Repair pot holes and paved areas (near gymnasium)
<br />125,000
<br />Northwest Cabarrus High
<br />Recut a swale and French drain to correct drainage
<br />problems on outfield of ball field
<br />10,000
<br />Northwest Cabarrus High
<br />Install new lighting in classrooms
<br />35,000
<br />Northwest Cabarrus High
<br />Run hot water to hand sinks
<br />20,000
<br />Northwest Cabarrus High
<br />Replace boilers
<br />75,000
<br />Northwest Cabarrus High
<br />Install new toilet fixtures throughout school
<br />35,000
<br />Northwest Cabarrus High
<br />Paint - interior and exterior
<br />50,000
<br />Northwest Cabarrus High
<br />Reconstruct dug out for softball field
<br />60,000
<br />Northwest Cabarrus High
<br />Repair /redo cross country trails
<br />140,000
<br />Northwest Cabarrus High
<br />Repair tennis courts
<br />66,000
<br />Northwest Cabarrus Middle
<br />Install new fire alarm system
<br />82,500
<br />Northwest Cabarrus Middle
<br />Bathroom upgrades to include fixtures and partitions
<br />80,000
<br />Northwest Cabarrus Middle
<br />Replace carpet in media center and replace w /tile in
<br />classrooms
<br />100,000
<br />Northwest Cabarrus Middle
<br />Upgrade existing camera system
<br />38,500
<br />Northwest Cabarrus Middle
<br />Upgrade 6th grade HVAC controls
<br />75,000
<br />Northwest Cabarrus Middle
<br />Painting interior and exterior
<br />35,000
<br />Northwest Cabarrus Middle
<br />Install pumps and tanks to well for track/field
<br />irrigation
<br />35,000
<br />Northwest Cabarrus Middle
<br />Install additional staff parking
<br />75,000
<br />Northwest Cabarrus Middle
<br />Replace exterior doors
<br />82,500
<br />Northwest Cabarrus Middle
<br />Resurface and restripe bus lot
<br />85,000
<br />Northwest Cabarrus Middle
<br />Renovate admin. offices
<br />120,000
<br />Patriots Elem
<br />Painting interior and exterior
<br />10,000
<br />Performance Learning
<br />Signage for PLC Main Office
<br />5,000
<br />Performance Learning
<br />Install new awning /covering above main doors to
<br />prominently mark school entrance
<br />11,000
<br />Pitts School Rd Elem
<br />Install cameras - exterior, to cover blind spots and rear
<br />rec areas
<br />38,500
<br />
|