October 10, 2013 (Board Retreat)
<br />Page 1772
<br />Beverly Hills Elem
<br />Replace carpet - 14 classrooms and main hallway front
<br />entrance
<br />150,000
<br />C A Furr Elem
<br />Paint - throughout (interior and exterior)
<br />35,000
<br />C A Furr Elem
<br />Install canopy between buildings, including walkways
<br />88,000,
<br />C A Furr Elem
<br />Additional lighting in car circle
<br />25,000
<br />C C Griffin Middle
<br />Install additional cameras and /or upgrade system
<br />25,000
<br />C C Griffin Middle
<br />Install awnings over 3 to 5 courtyard doors
<br />17,000
<br />C C Griffin Middle
<br />lInstall doors to divide gym and auxiliary gym
<br />33,000
<br />C C Griffin Middle
<br />1paint - classrooms (50`s) and gym
<br />60,000
<br />C C Griffin Middle
<br />Install canopy for car riders
<br />88,000
<br />C C Griffin Middle
<br />Construct storage building
<br />55,000
<br />C C Griffin Middle
<br />Replace carpet in classrooms
<br />150,000
<br />C E Boger Elem
<br />C E Boger Elem
<br />Repair /add concrete at entire area at back exit doors on
<br />main hall (water seeping under part of concrete)
<br />Replace carpet in 8 classrooms
<br />23,000
<br />40,000
<br />C E Boger Elem
<br />Seal exterior masonry
<br />110,000
<br />C E Boger Elem
<br />Paint - interior and exterior
<br />35,000
<br />Central Cabarrus High
<br />Media center - walls to ceiling for separation
<br />100,000
<br />Central Cabarrus High
<br />Remodel and update Concessions building
<br />16,500!
<br />Central Cabarrus High
<br />Replace dining room furniture
<br />35,000
<br />Central Cabarrus High
<br />Upgrade lighting in band room
<br />40,000
<br />Central Cabarrus High
<br />Replace all metal toilet partitions
<br />110,000
<br />Central Cabarrus High
<br />Replace ceiling tiles throughout building and remove
<br />abandoned cable
<br />122,0001
<br />Central Cabarrus High
<br />Remove asbestos tile in classroom wings
<br />198,000
<br />Central Cabarrus High
<br />Upgrade branch circuit panels
<br />175,000
<br />Central Cabarrus High
<br />Upgrade stadium rest rooms
<br />70,000
<br />Coltrane Webb Elem
<br />Replace water heater and storage tank and piping in
<br />kitchen area
<br />15,000
<br />Coltrane Webb Elem
<br />Renovate one Mobile Unit
<br />15,000
<br />Coltrane Webb Elem
<br />Construct greenhouse for magnet school
<br />30,000
<br />Coltrane Webb Elem
<br />Shelving /storage systems for classrooms
<br />30,000
<br />Coltrane Webb Elem
<br />Chairs; desks, and tables for 3 new classroom within next
<br />3 years
<br />45,000
<br />Concord High
<br />Upgrade electrical services
<br />30,000
<br />Concord High
<br />Construct storage building (at rear of auxiliary gym)
<br />165,000
<br />Concord High
<br />Replace the boilers
<br />125,000
<br />Concord High
<br />Upgrade Stadium Rest Rooms
<br />70,000
<br />Concord Middle
<br />Install sidewalk for ADA accessibility to the ball fields
<br />16,500
<br />Concord Middle
<br />Repairs to field house due to structural deficiencies
<br />140,000
<br />Concord Middle
<br />Install stand alone HVAC system for the auditorium and
<br />cafeteria
<br />200,000
<br />Concord Middle
<br />Replace carpet for front offices
<br />45,000
<br />Concord Middle
<br />Paint hallways, classrooms, doors and door frames
<br />35,000
<br />Concord Middle
<br />Construct storage building
<br />55,000
<br />Cox Mill Elem
<br />Wiring of 80 smart boards (board installation by CCS
<br />Technology)
<br />15,000
<br />Cox Mill Elem
<br />Add additional gravel on rear access road
<br />18,000
<br />Cox Mill Elem
<br />Install canopy for bus riders
<br />88,0001
<br />Cox Mill Elem
<br />Replace gym lighting
<br />15,0001
<br />Cox Mill Elem
<br />Construct 1 pair of group restrooms
<br />140,000,
<br />Cox Mill Elem
<br />Paint - hallways and classrooms (mainly classrooms and
<br />exterior structural elements)
<br />35,0001
<br />i
<br />Cox Mill Elem
<br />Replace carpet in hallways
<br />85,000
<br />Cox Mill Elem
<br />Repair casework
<br />160,000
<br />Cox Mill Elem
<br />Additional playing field
<br />100,000
<br />Cox Mill High
<br />Laminar FlowHood for Biotechnology Room x 4
<br />20,000
<br />Cox Mill High
<br />Install tornado rated doors in 1600 science area
<br />44,0001
<br />Cox Mill High
<br />Replace main corridor door hardware school -wide
<br />150,0001
<br />Cox Mill High
<br />Install netting for baseball /softball fields
<br />60,0001
<br />Cox Mill High
<br />Install concrete steps from bus parking to lower level
<br />35,000
<br />Cox Mill High
<br />Construct storage building at practice fields
<br />20,000
<br />Cox Mill High
<br />Install Rubberized track
<br />200,000;
<br />Early College
<br />Need a storage building. This can be a mobile unit.
<br />20,000
<br />Education Center
<br />Install cameras
<br />44,000
<br />Education Center
<br />Paint - throughout
<br />60,000!,
<br />Education Center
<br />Remodel Administration Wing
<br />70,000
<br />Education Center
<br />Paint hallways, offices, doors and door frames
<br />15,0001
<br />Education Center
<br />Remodel Administrative Offices
<br />60,000
<br />Education Center
<br />Replace carpet in hallways
<br />120,000
<br />Facilities Management
<br />Fencing and gate at drive (to laydown yard)
<br />55,000
<br />Facilities Management
<br />Install cameras - laydown yard and building
<br />44,000
<br />Glenn Center /
<br />Opportunity
<br />Replace fire alarm system
<br />82,5001
<br />1
<br />Glenn Center /
<br />Opportunity
<br />Replace lighting in hallways, classrooms, and offices
<br />165,000
<br />Glenn Center /
<br />Opportunity
<br />Paint - throughout
<br />75,000!
<br />Harold E. Winkler Middle
<br />Concession Building /Announcer Booth
<br />75,000
<br />Harold E. Winkler Middle
<br />Additional Security Cameras for Hallway to Bus Lot,
<br />Cafeteria per SRO
<br />15,0001
<br />Harris Road Middle
<br />Replace carpet in office area
<br />20,000
<br />Harris Road Middle
<br />Paint - interior and exterior
<br />35,000
<br />Harris Road Middle
<br />Remodel media center
<br />80,000
<br />Harris Road Middle
<br />Install four basketball goals in auxiliary gym
<br />16,000
<br />Harris Road Middle
<br />Install gym dividing doors
<br />33,000
<br />Harris Road Middle
<br />Install stand alone HVAC system for the gym and the
<br />dining room
<br />200,000
<br />Harrisburg Elem
<br />Repair or replace PA system in the gym and cafeteria
<br />10,000
<br />Harrisburg Elem
<br />Replace blinds throughout school
<br />15,000
<br />Harrisburg Elem
<br />Replace all sinks in group rest rooms
<br />20,000
<br />
|