Laserfiche WebLink
Kannapolis Middle School PCO # 005R Date: 12/07/16 <br /> _ Description of Work: Option to remove large oak tree instead of adding the segmental block retaining <br /> wall per PCO#005. <br /> Direct Cost of Change <br /> DESCRIPTION I LASORI IMATI-1 EQUIPI SUBCF TOTAL <br /> Remove tree and stump 0': 0 0 4,500 -4,500 <br /> 2 0' 0 0 0 0 <br /> 3. 0; 0 0 C 0 <br /> 4 __- -_ of a, a a o <br /> _ 0; 0 0 0 0 <br /> 6; _~ 0! 01 0 0 0 <br /> 71 0 0 0 C 0 <br /> 8j — 0 0 0 C 0 <br /> 9i 0 0, 0 0 0 <br /> 11 ;Estimating of Change 10 0, 0 0 10 <br /> 12 j Project Management of Change 0 0 0 0 0 <br /> 13 Project Administrator of Change 0 0� 0 0 0 <br /> 14;Scheduling of Change - 0 j 0 0 0 0 <br /> 15:Supervision of Change 0 i C 0 0 0 <br /> 16 Expendab'e Tools(5%of EFI direct labor) 0; 0 0 0 0 <br /> 17 Rough Hardware 0 0 0 0 0 <br /> 18 Housekeeping(1%of direct costs 1-10) C)! 0 0 0 <br /> 19'Dumpster(1/2%of direct costs 1-10) 0; 0; 0 0 01 <br /> 20 Final Clean 0 Oj 0 0 _0 <br /> 21'Reccrd Drawings/ow 0 0 0 0 0 <br /> 22,Punch List 0: 0 0 �— 0 —�_ 0 <br /> 23 __ 0? 0 0 0 0 <br /> 24,0vertlme Adjustment _ 01 0, 0 0 0 <br /> 25 Working Height Adjustment 0 0:1 0— 0 0 <br /> 26 Congestion Adjustment 0 01 0 0 0 <br /> 27 Out-of-Sequence Adjustment 0 01 0 0 0 <br /> Extended Project Overhead <br /> 1 Supervision/Truck/Fuef 0. 0i 0 0 0 <br /> 2 Gen Supt/Truck/Fuel — 01 0! 0 C 0 <br /> 3 1 Project Mgr/Auto/Fuel 0 0; 0 0 0 <br /> _4 Field Office/Storage 0; 0; 0 0_ _0 <br /> 5,Temp Toilets _ 0 01 0 0 — 0 <br /> 6;Temp Utilites - 0; 0• 0 0 0 <br /> 7: Oi _ 01 0 0 -- 0 <br /> 8', 0; 01 0 0 0 <br /> SUBTOTALS>>> 10: 0. _0 4600 4510 <br /> 42.00%PAYROLL T I --- ------� 4� NIA' N/A N/A 4 <br /> 7.25% SALES TAX N/A, 0 r 0 N/A 0 <br /> SUBTOTALS »> _ 14 0: G 4500 4514 <br /> _ FEE FOR CONTRACTOR-PERFORMED WORK>>> 15.00% _ 2 <br /> FEE FOR SUB-CONTRACTOR-PERFORMED WORK>>> 5.00% 225 <br /> SUBTOTAL>>> 4741 <br /> BOND PREMIUM »> 1.00% 47 <br /> _ QUOTE >>> $4,789 <br /> Calender Day Time Extension Required>>> 0 <br /> Proposal expires in j 15 days. <br /> This entire proposal shall become pail or any future Change Order, Edison Faard reserves the right to claim and recover impact <br /> costs In the event the cumulative total of Change Orders on this project is so significant to be disruptive and to cause <br /> inefficiencies. This proposal Is subject to review and revision if not accepted in writing within the time period stated herein. <br /> G-6 Page 237 <br />