Laserfiche WebLink
shave 11io <br /> CF <br /> SPORTS T U N f �:ac- �-- ..�,.�. <br /> CERT1FIEp FIELD t3171LDEtt <br /> .--� AUTHORIZED DEALER / off srAFF <br /> Kannapolis Middle Sehool <br /> Date: January 11,201 7 <br /> RE: Synthetic Turf field <br /> Quote: 1701-002 <br /> The following is a proposal by Medallion to supply and install synthetic turf at Kannapolis Middle School located at <br /> 1445 Oakwood Avenue, Kannapolis, NC. Upon acceptance of this proposal. Medallion will provide all materials. <br /> equipment and labor as outlined below. The scope of this proposal includes the following: <br /> Turf Scope of Work <br /> • Excavate canh for stone base- Spoils to be hauled offsite.Sub-grade to be quality assured with pronf roll. <br /> • Supply and install perforated drains along one side ofeach area. Drainage to tie to existing drain on site. <br /> • Supply and install non-woven fabric under trench drains at areas. Back-fill trenches with stone. <br /> • Supply and install non-woven fabric over entire sub base. <br /> • Supply and install perimeter nailer board to attach to side walk. <br /> • Supply and install laser graded 4-'stone base. <br /> • Supply and install approx.3.390 sqft of Mi axplay Supreme synthetic turf with,and intill.Color to be chosen <br /> from standard color line. <br /> Scopeof Work Total.........................................................-........-.............._........_........... $63,790.00 <br /> 'dotes: <br /> -Pricing does not include any storm water management structures or water infiltration testing. <br /> -Pricing does not include bonding,although Medallion is bondable at an additional cost. <br /> Pricing does not include handling or hauling of any hazardous or regulated materials. <br /> -Utility disconnects arc not included in scope or pricing. <br /> -Rock or repair of unsuitable soil will be an extra charge. <br /> -Excludes prevailing wages.union wages,or certified payroll <br /> -Pricing does not include fencing and irrigation. <br /> -Pricing does not include any logos unless specified above. <br /> -Price assumes access to the job site 24 hours a day,7 days a week. <br /> -Pricing is good for 90 days. <br /> -Freight pricing is FOB jobsite. <br /> Thank you for allowing Medallion the opportunity to provide you with this quote. Medallion specializes in solutions <br /> for athletic facilities and surfacing while delivering extensive expertise, comprehensive project management and <br /> excellence in service to our customers. If you have any questions please don't hesitate to contact me. <br /> Respectfully Submitted, <br /> Bryan Conley <br /> Sales <br /> (704)363-0274 <br /> Medallion Athletic Products,Inc. 350 River Park Road Mooresville.NC 28117 <br /> (P)704.660.3000 (F)704.660.3001 <br /> wwvv.m ed a l l i on ath leti c s.com <br /> G-6 Page 238 <br />