Laserfiche WebLink
➢ Address water issues:connections, storage capacity,and pressure. <br /> • Utilize Caldwell Road Extension and other new location roadways to create water loops. This would <br /> increase system resiliency and improve water quality. <br /> • Coordinate with utility partners: <br /> • Coordinate with Concord to ensure adequate capacity existing in elevated storage tanks. Currently the <br /> northern portion of the study area is served by a water tank in the vicinity of the CMS. An additional <br /> tank may be needed in the Concord system to meet the requirement for having at least half of daily <br /> water demand in elevated storage. <br /> • Coordinate with Mecklenburg County/Charlotte Water on serving areas in Mecklenburg County that <br /> are northwest and southwest of the study area(i.e. Caldwell Park)and determining needs for master <br /> meters and interconnects along US 29,Mallard and Back Creek. <br /> i <br /> Hud <br /> R 7 Speedway <br /> PS c P <br /> 29 �\ <br /> 4111t Hudspeth y <br /> Road#2 °n <br /> 10 rs the ood Pa <br /> ♦ PS <br /> 11i <br /> To <br /> Ns , oao Center <br /> rs <br /> entley <br /> ills <br /> go <br /> • <br /> 49 Circle PS <br /> wp New Park on <br /> Y ings Rd <br /> UNiVERS_I_.. 49 PS <br /> vs 111brook r Hoffner ��!7 PS ro rd '� <br /> a <br /> Q Study Area Ps k� � <br /> , a5 I Lift Station <br /> O <br /> WSACC Gravity Main <br /> Forcemain <br /> 1 <br /> Sewer Gravity Main(Municipal) <br /> Water Main int <br /> Water and Sewer Basins PS <br /> Figure 13. Proposed Utility System Upgrade Phases <br /> 581Morehead West Area Plan <br /> Attachment number 1 \n <br /> G-2 Page 200 <br />