Laserfiche WebLink
X01 % ORION <br /> 10� ��� % V <br /> ANN <br /> - NN <br /> Nationwide Realty Investors McConnell Parking Garage <br /> Columbus, OH <br /> Project Value Architect Structural Engineer <br /> Nationwide Realty Investors $14 million THP Limited, Inc. THP Limited, Inc. <br /> Assignment Project Completion Mechanical Engineer Civil Engineer <br /> Design-build General Contractor December 2012 Prater Engineering Associates, Inc. EMH&T <br /> Description Owner Reason for Building <br /> 472,000 sf, 6-story parking garage Nationwide Realty Investors(NRI) is one of the country's <br /> 1,496-vehicle capacity with a cross over above the 6th most progressive developers with more than $1 billion <br /> floor for additional parking in real estate investments. During the past decade, NRI <br /> Cast in place, concrete frame, post tensioned with a has been revitalizing and changing downtown Columbus <br /> masonry facade with the Nationwide Arena District, which features 1.5 <br /> million square feet of retail development.Additional <br /> Why Messer parking was necessary to support Ohio's reinvigorated <br /> NRI chose Messer to lead this project due to more than interest in downtown Columbus. <br /> $150 million in construction of successful NRI projects Unique Challenges and Features <br /> and our ability to provide extensive value engineering <br /> throughout the preconstruction process. In order to maintain the project's aggressive schedule <br /> one slab on deck pour needed to be completed each <br /> week-this included 30 pours ranging from 250 cubic <br /> yards to 420 cubic yards per pour. <br /> While the remainder of the parking garage was being <br /> completed, the first several floors were turned over to <br /> NRI. Our project team worked diligently to ensure the <br /> safety of the patrons was maintained at all times. <br /> Despite NRI not specifying an inclusion goal, our team <br /> included 20% minority-and women-owned business <br /> enterprises. <br /> The project team coordinated extensively with multiple <br /> I parties to eliminate disruptions to the businesses and <br /> residents that also call the Nationwide Arena District <br /> home. �t chme�pt r}umbeE 1 \n <br /> WeAreBuilding.iealihCare. 31 ©2 1 esser onsrg. o. <br /> G-7 Page 152 <br />