Laserfiche WebLink
May 6, 2016 <br />Edison Foard <br />P.O. Box 19888 <br />Charlotte, NC 28219 -0888 <br />704- 329 -8000 <br />Attn: David Pofahl <br />Re: Royal Oaks Elementary <br />Post Addendum #4 Proposal <br />Gentlemen, <br />Thank you for allowing Seagraves Masonry, Inc. to assist you in your masonry needs for the Royal Oaks <br />Elementary School. As a long time Cabarrus County resident we appreciate the opportunity. <br />The following breakdown is for the Post Addendum 4 changes to the project. This breakdown is a net <br />proposal and includes all deductions and adds to the project. As some areas did decrease the masonry packages <br />other increased the package. <br />Breakdown For Post Addendum 44 — Masonry <br />Labor <br />$26,633.00 <br />Material <br />$29,844.00 (Includes Rebar Material) <br />Equipment <br />$ 5,743.00 <br />Subcontractor <br />$ 204.00 (Minor Increase in Veneer) <br />Subtotal <br />$62,424.00 <br />O &P 15% <br />$ 9,363.00 <br />Total <br />771 <br />We've assumed that it is acceptable to continue the shop drawings for the rebar package based on this <br />addendum. If that is not the case please let us know as soon as possible. <br />Again Thank you for the opportunity to work on this project and if we can be of further service to you <br />please feel free to contact us. <br />Sincerely, <br />Sea v�s Masa - -, Inc. <br />Robbie Ludwig } <br />Chief Estimator <br />Page I 1 <br />Attachment number 1 \n <br />G -3 Page 195 <br />